Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room-movable wall, folding partition,operalbe wall-EBUNGE
Home  > PRODUCTS  > 

Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room

EBUNGE
Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room-EBUNGE
Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room-EBUNGE
EBUNGE
Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room-movable wall- folding partition-operalbe wall-EBUNGE
Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room-EBUNGE
EBUNGE

Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room

Model
Office sofa
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office sofa
Feature: Big Seating Capacity
Finish: Pu leather
Application: Office, conference room and etc
General use: Office furniture
Material: Stainless steel base,sponge and leather
Function: Commercial Sofa Set
Size: 1800*810*820mm
Color: Can be customized
Style: Modern style

Wooden Office Sofa Design Modern Furniture Office Sofa Chair for Conference Room



1.New design leather chair surface material:


(1)Top grain leather + PVC


(2)Full Top grain leather


(3)PU+PVC


(4)Full PU


(5)Fabric


(6)Aniline leather


(7)Bonded leather


2. Color can be custom designed:


White/dark brown/ beige/brown/green/yellow etc


3. Foam dimension :


High-density foam for cushions and for back and armrest.


4. Inner constructions:


A) Full dried solid tropical hardwood frame, undergone anti-worm and treatment. Humidity control between 12-15%, (international occean transport standard)


B)Metal coil springs and fabric rubber with rust and moisture proofing treatment.


C) Spray-bonded cotton between the leather and foam, no sagging.


1.jpg


Technical information:


NameComfortable Black PU leather Single Seat Office Sofa
Main MaterialPU Leather, genuine leather is also optional;
FoamHigh resilience foam
BaseStainless steel base
ColorBlack, other color is optional
MOQ1 piece
DimensionsThree seats: 1950*820*810mm, size can be custom designed
Packing

1.Protected with bag and foam.

2.Outer exported standard carton or woven bag.


2.jpg


Office sofa main material:


Solid frame, using 202 high quality hollow stainless steel packed solid iron appearance, characteristics of oxidation time is slow, high bearing capacity, bending strength is 3-5 times,


Common bearing pimp: Single capacity ratings of about 30-50 kg, with nails fixed in the solid frame, sturdy and durable, but after weighing the shape recovering time is slower with the cushion, suggestions.


Leather / xipi cushion and backrest: Skin with head layer skin / xipi as contact (contact surface includes a sit, sit back before, pulled back the top surface and the rest), including the pulling buckle and bone quality leather.


The cushion and the backrest internal filler for high density sponge, with recovery of the good, not easy to deformation.


Characteristics of head layer cowhide wear-resistant, breathable, soft texture, xipi cost-effective, fashion, rich colors. Five parts: Selection of Guangzhou local production hardware, durable, smooth surface and functional.



office sofa chair.jpg


Office sofa advantage:


1. Competitive price and good quanlity workmanship.


2. Modern, Comfortable, Elegant and endurable, Environmentally-friendly materials.


3. The best after-sales service, Mutual Development, Mutual Benefits, so make long time cooperation.


4. Thousands of models for choice, fully meet different customers' demands.


5. Different styles with different material and price range, control cost in the best way.


6. Customized service: OEM, ODM available.


office sofa color card.jpg


Packing and shipping:


Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.



1.For mass production big quantity by sea : We've cooperated with our shipping forwarder for many years, and
they can offer us the competitive price by the vessels such as PIL, APL, OOCL, CSCL, MSC and CMA and so on.


2.Import taxes : We can help you reduce and avoid import taxes by declaring prices low.


3_.jpg


We can offer:


We design and manufacture value for money products with a one year warranty on all the outstanding ranges illustrated in this brochure.

We offer a complete service package covering site surveys, CAD technical drawings, and quotation presentation. Emphasis is placed on quality assurance backed by a comprehensive after sales service.

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...