EBUNGE  > 

AI - Page Sitemap

 > 

wooden movable wallsfactory direct supply for conference room

wooden movable wallsfactory direct supply for conference room

Wooden movable wallsfactory direct supply for conference room

Model
85 mm sound proof partition
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T Western Union
Delivery Time
15-20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity welcomed
Packing Details
Paper carton,outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Price on wheels
Feature: Sound proof
Finish: Melamine
Application: cinference room partition
General use: Office furniture
Material: MDF+ Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Product Comparison
BUNGE PARTITIONS has professional production workshops and great production technology. office furniture we produce, in line with the national quality inspection standards, has reasonable structure, stable performance, good safety, and high reliability. It is also available in a wide range of types and specifications. Customers' diverse needs can be fully fulfilled.Compared with other products in the same category, office furniture produced by BUNGE PARTITIONS has the following advantages.
  • application-EBUNGE-img-1
    application-movable wall- folding partition-operalbe wall-EBUNGE-img-1
Product Details
Want to know more product information? We will provide you with detailed pictures and detailed content of office furniture in the following section for your reference.office furniture is a truly cost-effective product. It is processed in strict accordance with relevant industry standards and is up to the national quality control standards. The quality is guaranteed and the price is really favorable.
  • application-wooden movable wallsfactory direct supply for conference room-EBUNGE-img-1
Company Advantages
1. The quality control of BUNGE movable walls is strictly controlled. It covers the material of aluminum, the weight of track, soundproof rate, fire safety level and so on.
2. The product is built to last. Thanks to its durable construction, it is able to withstand great abuse under harsh environments.
3. The product can bear the most demanding industrial conditions. It is made of heavy-duty materials such as steel alloys and is not prone to rust and corrosion.
4. The product directly contributes to improving productivity. Because it can work much faster than human and reduce errors, saving time for production.
5. With its advanced control system, the product helps increase productivity. It finally decreases production time and increases output.

Acoustic Moveable Price on Wheels Walls  for Conference Room


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

wooden movable wallsfactory direct supply for conference room-1

wooden movable wallsfactory direct supply for conference room-2

wooden movable wallsfactory direct supply for conference room-3

wooden movable wallsfactory direct supply for conference room-4


Price on Wheels Walls  technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

wooden movable wallsfactory direct supply for conference room-5


Price on Wheels Walls  features


1. The price on wheels walls  is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the price on wheels walls can be customized, such as the size, the colors and the surfaces.

3. The  price on wheels walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

wooden movable wallsfactory direct supply for conference room-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

wooden movable wallsfactory direct supply for conference room-7


Price on Wheels Walls  packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

wooden movable wallsfactory direct supply for conference room-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

wooden movable wallsfactory direct supply for conference room-9






Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has a solid movable walls manufacturing capability.
2. Over the year, we have significantly increased our sales volumes in overseas markets. At this moment, we are facing a large market momentum, which helps us expand more marketing channels.
3. The enterprise mission of Guangdong Bunge Building Material Industrial Co.,Ltd is to focus on innovation, to create customer trustworthy movable walls products. Please contact us! Guangdong Bunge Building Material Industrial Co.,Ltd is dedicated to 'Good Faith', 'Better Services' and 'Best Attitude'. Please contact us!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...