Home  >  APPLICATION Factory  >  Best Auditorium Partition Walls Wholesale  > 

Wholesale sliding operable panel partitions Bunge Brand

Wholesale sliding operable panel partitions Bunge Brand

Wholesale sliding operable panel partitions Bunge Brand

Model
65 mm sound proof partitions
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable walls
Feature: Soundproof
Aluminium frame thickness: Less than 4 m
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Multi color
Style: Sliding
Enterprise Strength
  • Bunge Building Decoration Engineering has many professional talents with rich industry experience and strong technology, which provides a strong guarantee for product quality.
  • Bunge Building Decoration Engineering insists on combining standardized services with personalized services to meet customers' different needs. This contributes to the brand image building of our company's quality service.
  • Bunge Building Decoration Engineering will insist on the business philosophy of 'quality creates the brand, technology makes benefits'. We promote the enterprise spirit of 'pragmatism, progress, and innovation'. We strive to build a first-class brand and continuously provide high-quality products and services.
  • In the past years, Bunge Building Decoration Engineering has constantly learned advanced production technology and has gradually improved the corporate image. Now we obtain remarkable achievements and enjoy a good reputation in the Manufacturing Decoration Materials industry.
  • Bunge Building Decoration Engineering's movable walls are reasonably-priced and quality-reliable. They enjoy a high market share in the international market.
Company Advantages
1. The simple and unique design makes Bunge operable panel partitions convenient to use. Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function
2. With its excellent quality and unsurpassed performance, this product sets the standard for similar products. A magnetic strip is applied to the product to ensure strong functionality
3. Bunge guarantees the quality of partition wall dividers. Equipped with a sealing device, the product is praised for its tight sealing performance
4. Guangzhou Bunge Building Decoration Engineering Co., Ltd has more interaction with customers. It adopts the high-performance MDF board and rockwool panel

Interior Mobile Operable Sliding Sound Proofing Partitions

MAIN TITLE
Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-1

Description


Sound proofing partition wall is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Sliding partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-2Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-3Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Soundproofing partition wall has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-5Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-6

Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-8Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-9

Movable partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-10

Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-11Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-13

Packing & shipping


Soundproofing partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-14Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-15

Bunge-Manufacturer Of Retractable Wall Interior Mobile Operable Sliding Sound-16



Company Features
1. Bunge has won the recognition from customers at home and abroad.
2. Guangzhou Bunge Building Decoration Engineering Co., Ltd has mastered the autonomous research and development capacity of the new partition wall dividers.
3. Doing the best retractable wall is the common pursuit and ideal of Bunge. Please contact us!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...