Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

Wholesale multi sound suppression panels tiles Bunge Brand

Wholesale multi sound suppression panels tiles Bunge Brand

Wholesale multi sound suppression panels tiles Bunge Brand

Model
BG perforated acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 6,9,12,15,18 mm
Partition material: Black fleece
Finish: Melamine,veneer,metal
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Fireproof and eco-friendly
Size: 2440*1220 mm, 1220*600 mm
Color: Can be customized
Style: Modern
Product Comparison
Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition is commonly praised in the market due to good materials, fine workmanship, reliable quality, and favorable price.With a focus on high standards and strict requirements, Guangdong Bunge Building Material Industrial Co.,Ltd uses authentic materials to design and produce movable walls. We guarantee the quality by strictly controlling the mixed application of inferior materials in the production. They feature good design, long service life, corrosion resistance, as well as easy cleaning and installation. They are unanimously recognized by the market and have a high repurchase rate.Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition has better performances, as shown below.
  • Bunge-Manufacturer Of Sound Insulation Panels Fireproof Perforated Wooden Acoustic
    Bunge-Manufacturer Of Sound Insulation Panels Fireproof Perforated Wooden Acoustic-1
Company Advantages
1. The main structure of the sound deadening panels is composed of sound suppression panels which is applicable in many occasions. Multiple accessories of the product can be provided to the customers
2. Owing to sound reducing wall panels, Bunge has gained much more popularity than before. The patterns of the product can be customized
3. Excellent customer service is also one of the core competencies of Guangdong Bunge Building Material Industrial Co.,Ltd. Defects will not be founded in the product after it is strictly inspected
4. Guangdong Bunge Building Material Industrial Co.,Ltd's commitment is to provide innovative localized noise reduction panels products that play an important role in global customers. It is widely used for privacy protection

Fireproof Perforated Wooden Acoustic MDF Panels For Walls And Ceilings

Perforated Acoustic Panels Features

1 The perforated wood acoustic soundproof wall panel is made of high quality MDF board.

 

2 According to the customer’s acoustic and decoration requirement, our MDF board can equipped with outstanding environmental, flame retardant and waterproof function, even can with various colors and finish choices.
 

3 Compared with the grooved acoustic panel, the perforated wood acoustic soundproof wall panel has better impact resistance.
 

4 Our perforated acoustic soundproof wall panel’s highest fire retardant grade can reach A2(GB) grade, and the best environmental protection can reach E1(GB) grade.


 

Bunge-Find Noise Reduction Panels Fireproof Perforated Wooden Acoustic

Technical Information
Model typeE16/6,E32/6,V32/6,E35/1.5-10,V32/3-10
Size600*600,1200*600,2400*1200mm
Thickness12,15,18mm
Finishmelamine, veneer, metal finish, acrylic, PU leather,
paintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter
Backside finishAcoustic felt, woven fabric
Fireproof gradeGB8624 2012 A,B1,B2,B3
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Depth of groove7mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree speciesMaple, cherry, Oak, teak, walnut, ashtree, sabelli, birch,
CertificationBV,CE,SGS,ISO9001-2008,
Test reportEco protection, sound absorption, flame retardant

Bunge-Find Noise Reduction Panels Fireproof Perforated Wooden Acoustic-1

Perforated Acoustic Panels Applications

1.Studios, recording rooms, listening rooms, rehearsal rooms and more professionally interspace timbre projects.


2.Theaters, indoor gymnasiums, discos, KTV rooms and more performance and entertainment location.


3.Meeting rooms, offices, halls, hotels and more sound absorption and secrecy projects.


4.Air-port, railways, bus-stops, workshops and more noise reduction projects.


Bunge-Find Noise Reduction Panels Fireproof Perforated Wooden Acoustic-2

Perforated Acoustsic Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Find Noise Reduction Panels Fireproof Perforated Wooden Acoustic-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Find Noise Reduction Panels Fireproof Perforated Wooden Acoustic-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. By supplying sound deadening panels and professional service, Bunge now ranks top in the market.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has studied the new process of sound suppression panels production.
3. With sound reducing wall panels being its service ideology, Guangdong Bunge Building Material Industrial Co.,Ltd provides noise insulation panels. Check now!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...