Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

Wholesale mdf sound suppression panels anditordium Bunge Brand

Wholesale mdf sound suppression panels anditordium Bunge Brand

Wholesale mdf sound suppression panels anditordium Bunge Brand

Model
BG perforated acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 6,9,12,15,18 mm
Partition material: Black fleece
Finish: Melamine,fabric,metal
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Fireproof and eco-friendly
Size: 2440*1220 mm, 1220*600 mm
Color: Can be customized
Style: Modern
Product Details
The details of folding partition are shown for you at below.Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.Guangdong Bunge Building Material Industrial Co.,Ltd has the ability to meet different needs. folding partition is available in multiple types and specifications. The quality is reliable and the price is reasonable.
  • Bunge-Find Sound Deadening Panels Sound Reducing Wall Panels From Bunge Building
Application Scope
Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls can be used in multiple industries.Guangdong Bunge Building Material Industrial Co.,Ltd is able to meet customers' needs to the greatest extent by providing customers with one-stop and high-quality solutions.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.
  • Bunge-Find Sound Deadening Panels Sound Reducing Wall Panels From Bunge Building
Company Advantages
1. The raw materials of Bunge sound suppression panels is extremely strict selection. The product helps to create a multi-purpose room for multiple uses
2. Delivering the quality product has always been our chief concern. The product can far reach from one wall to another wall
3. Its huge market prospects have helped Bunge attracted more and more customers in the industry. It is manufactured according to environmental protection requirements

Sound Diffuser Decorative Ceiling Board Perforated Wooden Acoustic Wall Panels

Perforated Acoustic Panels Features

1.Perforated wooden acoustic panel is manufactured from 100% polyester fibers and does not contain chemical binders including formaldehyde.


2.Perforated wooden acoustic panel products contains a minimum of 75% previously recycled polyester fiber (from PET bottle flake)ensuring comparatively low embodied energy.


3.Its polyester non-woven surface is easy to be bonded and fit for most kinds of surface sheet.


4.Absorb reverberated sound, providing acoustic control to lessen the amount of noise in a room.


5.Protect and adorn your walls, providing high-impact wall protection while serving as a viscous surface, giving the same functionality as a bulletin board without sacrificing aesthetics.


6.Easy-to-install, cuts, fastens, and paints easily, less maintenance, more life;


 

Bunge-Find Noise Reduction Panels Sound Diffuser Decorative Ceiling Board

Technical Information
Model typeE16/6,E32/6,V32/6,E35/1.5-10,V32/3-10
Size600*600,1200*600,2400*1200mm
Thickness12,15,18mm
Finishmelamine, veneer, metal finish, acrylic, PU leather,
paintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter
Backside finishAcoustic felt, woven fabric
Fireproof gradeGB8624 2012 A,B1,B2,B3
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Depth of groove7mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree speciesMaple, cherry, Oak, teak, walnut, ashtree, sabelli, birch,
CertificationBV,CE,SGS,ISO9001-2008,
Test reportEco protection, sound absorption, flame retardant

Bunge-Find Noise Reduction Panels Sound Diffuser Decorative Ceiling Board-1

Perforated Acoustic Panels Applications

1.Studios, recording rooms, listening rooms, rehearsal rooms and more professionally interspace timbre projects.


2.Theaters, indoor gymnasiums, discos, KTV rooms and more performance and entertainment location.


3.Meeting rooms, offices, halls, hotels and more sound absorption and secrecy projects.


4.Air-port, railways, bus-stops, workshops and more noise reduction projects.


Bunge-Find Noise Reduction Panels Sound Diffuser Decorative Ceiling Board-2

Perforated Acoustsic Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Find Noise Reduction Panels Sound Diffuser Decorative Ceiling Board-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Find Noise Reduction Panels Sound Diffuser Decorative Ceiling Board-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Mainly manufacturing sound deadening panels, Guangdong Bunge Building Material Industrial Co.,Ltd is highly competitive in terms of capabilities.
2. Guangdong Bunge Building Material Industrial Co.,Ltd introduced many top technicians in noise reduction panels industry.
3. To provide the best noise cancelling wall panels and serve well is the mission for Bunge to accomplish. Welcome to visit our factory!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...