Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  >  Wholesale folding folding wall Bunge Brand
Wholesale folding folding wall Bunge Brand

Wholesale folding folding wall Bunge Brand

Model
85 mm hotel partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first

Product name: Hotel partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding
Enterprise Strength
  • Bunge Building Decoration Engineering has built a high-quality talent team based on the principle of 'introduction' and 'training'. At present, we have a number of senior talents who are familiar with product production, enterprise management, and capital operation.
  • Bunge Building Decoration Engineering has a professional service team to provide efficient and quality services for customers.
  • In the future development, Bunge Building Decoration Engineering always adheres to the enterprise spirit to be tough, hard-working, united and cooperative. Based on local, we seek development in the whole country and even the whole world. We strive to develop the business in our own way and lead the industry.
  • In the past years, Bunge Building Decoration Engineering has never been afraid of making mistakes and has been constantly making progress. We have gradually developed into a supplier for many enterprises, from a small company with little popularity. Now we enjoy a relatively high recognition and reputation in the Manufacturing Decoration Materials industry.
  • Since the establishment, Bunge Building Decoration Engineering has been constantly improving the operation mode and channel. So far, the sales network has spread all over the country.
Product Details
In order to know movable walls better, Bunge Building Decoration Engineering will show you the specific details in the following section. Bunge Building Decoration Engineering introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product. Bunge Building Decoration Engineering's movable walls is commonly praised in the market due to good materials, fine workmanship, reliable quality, and favorable price.
  • Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition
Company Advantages
1. It is highly recognized for its excellent thermal insulation property. There are a professional design team only responsible for design of folding panel partition.
2. This offered Bunge brand product is with stable performance. It will not be easy to swing after being reliably installed
3. With limitless potential, this product supports a favorable outlook. The product features a retractable performance
4. Our wide range of products are the smart choice for clients. It will be safely packaged in a carton box and a wooden box


Operable Wooden Soundproof Folding Hotel Partition Walls Malaysia

Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm hotel partition walls ONLY FOR $85.

 

85 mm hotel partition walls ONLY FOR $98.

 

100 mm hotel partition walls ONLY FOR $118.

 

125 ultra-high system hotel partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-1

Product Description


  •   Extensive worldwide sales network that has proved that our hotel partition walls work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-2
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-4

Components of Hotel Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the hotel partition walls with wheels.

Wheels/Rollers:  It is the carrier for the hotel partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the hotel partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-5
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-6
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-7

Parking Styles of Hotel Partition Walls

As you know, when we do not use the hotel partition walls, we can park them to the parking area. Actually there are many parking styles for the hotel partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-8
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-9
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-10



Different Finishes of Hotel Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-11
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-12
Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of hotel partition walls. The operable partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the hotel operable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Folding Room Dividers | Operable Wooden Soundproof Folding Hotel Partition-14



Company Features
1. With a unique vision, Guangzhou Bunge Building Decoration Engineering Co., Ltd is a leader in providing high quality folding wall and services.
2. With the core technology competitiveness, Guangzhou Bunge Building Decoration Engineering Co., Ltd takes up wide oversea market for folding room dividers.
3. Quality and service are always seen as key factors in Bunge's long-term development. Get quote!
Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact
/* 客户要求添加的 */