Home  > PRODUCTS  > Office Furniture  >  Water Proof Standard Office Furniture Partitions Table With Drawers Two - Six Office Desk Dividers
Water Proof Standard Office Furniture Partitions Table With Drawers Two - Six Office Desk Dividers

Water Proof Standard Office Furniture Partitions Table With Drawers Two - Six Office Desk Dividers

Model
BG Office Partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first

Product name: Office Partitions
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminum and board
Finish: Melamine,veneer,metal
Application: Office,conference room,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Office Work,office partitions,office dividers,office standing
Size: Accept customized
Color: Can be customized
Style: Modern

Water Proof Standard Office Furniture Partitions Table With Drawers Two - Six Office Desk Dividers

Office Partition Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

Bunge-Office Furniture Sets, Water Proof Standard Office Furniture Partitions


Technical Information
ItemFactory direct sell office furniture oem modular office furniture
Item NOBUNGE Office partition walls
NameOffice workstation, office partition,office cubicle
ShapeOptional/based on clients‘ requirement
PackagingFilm+foam+carton+wooden frame (4 layers protection)
Size1200W*600D*1050H and optional
Desk top MaterialTop grade E1 MFC melamine board
Partition MaterialAluminum /tempered glass
Desktop Seal edgePVC/ABS
Products CharacterEco-friendly,Anti-Water, Anti-Scratch, Anti-Dirty
Model No.BUNGE Office Workstations
MaterialE1 Level High Density Board/Melamine/Aluminum
Size1500*500*750/seater
CBM0.5 cbm/5 PC
Net Weight75 KG
QTY/40HQ180 pieces
Steel Thickness1.5MM thickness tube
ColorMore than 20 colors can be optional.
PackingStandard carton with foam corner
Advantages* Thousands of models for choice to meet different client's demands;
Different styles with different price range, can control cost with best way;
* Customized service, OEM, ODM available

Bunge-Office Furniture Sets, Water Proof Standard Office Furniture Partitions-1

Office Partitions Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office partition walls should be tested before delivering out producing workshop.

Bunge-Office Furniture Sets, Water Proof Standard Office Furniture Partitions-2


Office Partitions Finishing

There are 3 kinds of finishes to choose:

Bunge-Office Furniture Sets, Water Proof Standard Office Furniture Partitions-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Office Furniture Sets, Water Proof Standard Office Furniture Partitions-5


Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact
/* 客户要求添加的 */