Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Top Grooved Wooden Acoustic Panels Company  > 

wall wooden acoustic panel material materials Bunge company

wall wooden acoustic panel material materials Bunge company

wall wooden acoustic panel material materials Bunge company

Model
BG grooved wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton,as requested.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Grooved acoustic wall panels
Feature: Sound absorbing,fire resistant
Finish: Melamine,veneer
Application: Hotel,banquet hall,conference room,office
General use: Sound absorbing materials
Material: MDF
Function: Noise reduction
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Modern
Product Details
Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls is processed based on advanced technology. It has excellent performances in the following details.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market.Closely following the market trend, Guangdong Bunge Building Material Industrial Co.,Ltd uses advanced production equipment and manufacturing technology to produce movable walls. The product receives favors from the majority of customers for the high quality and favorable price.
  • Bunge-High-quality Sound Absorbing Wall Panels | Fire Resistance And Sound Absorbing
Application Scope
glass partitions's application range is specifically as follows.Guangdong Bunge Building Material Industrial Co.,Ltd always focuses on meeting customers' needs. We are dedicated to providing customers with comprehensive and quality solutions.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.
  • Bunge-High-quality Sound Absorbing Wall Panels | Fire Resistance And Sound Absorbing
Company Advantages
1. The design of sound absorbing panels is quite reasonable in structure, both acoustic panel material and economical. Equipped with a sealing device, the product is praised for its tight sealing performance
2. The outstanding team upholds a customer-oriented attitude to provide the high quality product. There are various colors offered for the product
3. The product is characterized by stable performance and long service life. The patterns of the product can be customized
4. With the advanced technology and strict quality control system, Guangdong Bunge Building Material Industrial Co.,Ltd ensures to provide customers with excellent and High-quality products. The product features a retractable performance

Fire Resistance and Sound Absorbing Material Grooved Timber Wood Acoustic Panels

Grooved Wall Panels Performance


Absorption is usually defined in terms of an absorption coefficient(usually denoted by the Greek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it. α=1 means that the material absorbs all sound energy incident on it and reflects none.

 

Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.


As you can see our Testing report show that our products have a very good performance in a large range of application.


 

Bunge-Professional Sound Absorbing Panels Soundboard Panels Supplier

Technical Information
     Product Type   Grooved Wood Acoustic Panel
     Standard Model   59/5 60/4 28/4 29/3 13/3 14/2 
     Non-Standard Model   40/3 38.5/4 18/3 17/4 8/3 8/2 5/3 6/2
     Material    High qulity MDF board
     Basic Material

   General, Economic, Fireproof, Moisture-proof, Composite,

   Magnesium, solid wood etc.

     Finish

   Melamine, Natural Wooden Veneer, Fireproof board, Painting,  

   Metal, Technology veneer, Leather etc.

     Color    Color chart or customized
     Size   133*2440 mm / 197*2440 mm
     Thickness   12mm / 15mm / 18mm
     Fireproof Grade   A2
     ECO Grade   E1
     Application

   Gymnasium ,Meerting room,multi-function hall, auditorium,

   Conference room, Banquet hall,etc.

Bunge-Professional Sound Absorbing Panels Soundboard Panels Supplier-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop etc.


Bunge-Professional Sound Absorbing Panels Soundboard Panels Supplier-2

Grooved Wall Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-Professional Sound Absorbing Panels Soundboard Panels Supplier-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested 6about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the acoustic panel in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Professional Sound Absorbing Panels Soundboard Panels Supplier-4



Company Features
1. Bunge has powerful private brand recognition, influence and popularity in the sound absorbing panels field.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a young and dynamic technical team.
3. Bunge Building Material can provide far more value for you than other brands. Inquire online!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...