Home  >   > 

Theater Interior Polyester Acoustic Panels , Sound Proofing 3d Decorative Wall Panels

Theater Interior Polyester Acoustic Panels , Sound Proofing 3d Decorative Wall Panels

Theater Interior Polyester Acoustic Panels , Sound Proofing 3d Decorative Wall Panels

Model
9 mm polyester acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Related Products
Product name: Polyester acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 2440 mm
Partition material: 1220 mm
Finish: Polyester fiber
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Modern

Theater Interior Polyester Acoustic Panels , Sound Proofing 3d Decorative Wall Panels

Polyester Acoustic Panels Details


1. The acoustic panels of solid material uniformity, has a long life.

 

2. It has a good decorative effect, and more than 40 kinds of colors.

 

3. Environmental performance, formaldehyde content of.

 

4. Flame retardant in line with the national level GB50222-95B1.

 

5. Installation is simple and convenient construction.

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier


Technical Details
Product namePolyester acoustic wall panels
Normal sizeoron decoration material1220*2440*9mm or can be customized
Raw materials100% Polyester fiber
Shapesheet
FeaturesFireproof, waterproof and soundproofing
Sound-absorption coefficient0.9
Density3.2kg/m3 or 4kg/m3
Colorred, green, black, yellow and other color can be customized
Environmental

E1 grade

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier-1


Packing Details & Payment Terms

Packing detail:


offer customized packing, such as drawstring cotton bag, color box, pp bag, hangtag and so on.


Normal packing: pp bag and carton.


Delivery time:


by sea, 10-25days.


Payment term:


1.40% deposit by TT before production, 60% balance payment by TT before shipping.


2.L/C at sight when amount is up to 10,000USD.


Sample: Free sample.

 

Trade Terms:FOB


Shipping: by sea, by air and by express delivery.

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier-2


Polyester Acoustic Panles Application

The polyester acoustic wall panels are suitable for opera, theater, recording studio, recording studio, studio, audition room, radio, business office, function rooms, conference rooms, studio, concert hall, auditorium, gymnasium, leisure and entertainment, Hotels.

Bunge-Quality Acoustic Insulation Panels Room Acoustic Panels Supplier-3



MAIN TITL

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...