Home  >  Quality PRODUCTS For sell  > 

style foldable partition doors frame EBUNGE

style foldable partition doors frame EBUNGE

style foldable partition doors frame EBUNGE

Model
Folding partition wall
Brand Name
BUNGE
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton packing, box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition wall
Feature: Divide space
Partition material: MDF board, plywood
Finish: Melamine,fabric,leather,plywood and etc
Application: Banquet hall,conference room,classrom,hotel
General use: Sliding folding partition
Material: Aluminium frame and mdf board
Function: Sound insulation
Size: Per panel width 800-1200 mm
Color: Can be customized
Style: Modern style
Enterprise Strength
  • BUNGE PARTITIONS puts customers first and strives to provide them with quality and considerate services.
Company Advantages
1. EBUNGE movable partition is manufactured/processed under standardization production system.
2. The product is proven to function timelessly on a basis of its reasonable design and fine craftsmanship. It can be used for a long time without breakdown.
3. This product has good durability and is suitable for long-term use and storage.
4. The product has found wide application in various fields.
5. It can be customized in a wide range of specifications according to intended applications.

Soundproof Mobile walls Partition Sliding Walls Acoustic Movable Folding Partition Wall

Description

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

 

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge

Techinical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface

Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-1

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-2

EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-3

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.

EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-4

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD. AND FREE OFFICE CHAIR


EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-5


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.

EBUNGE-Movable Partition, Foldable Partition Doors Price List | Ebunge-6


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd is a Chinese company that specializes in the design, production, and sale of movable partition.
2. movable partition have won much reputation for the application of high technology.
3. Guangdong Bunge Building Material Industrial Co.,Ltd continuously optimizes the management and service systems to promote better development. Get more info! The company demonstrates its business ethics in several ways. This ethics standard encourages it to do the right thing for society. For example, we lower the carbon footprint during production, take part in fair business trade, treat employees fairly and ethnically, etc. Get more info!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...