Home  >  Quality PRODUCTS For sell  >  Office Furniture Exporter  > 

staff direct secretary office partitions Bunge Brand company

staff direct secretary office partitions Bunge Brand company

staff direct secretary office partitions Bunge Brand company

Model
BG office workstations furniture
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office workstations furniture
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminumandboard
Finish: Melamine,fabric, veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Fireproof and eco-friendly
Size: Standard,as request
Color: Can be customized
Style: Modern
Product Comparison
Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions is commonly praised in the market due to good materials, fine workmanship, reliable quality, and favorable price.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions has been further improved based on advanced technology, as reflected in the following aspects.
  • Bunge-Office Furniture Sets Manufacture | 4-8 Person Modular Office Face To Face
    v s
    Bunge-Office Furniture Sets Manufacture | 4-8 Person Modular Office Face To Face-1
Product Details
Next, Guangdong Bunge Building Material Industrial Co.,Ltd will present you with the specific details of movable walls.With a focus on product quality, Guangdong Bunge Building Material Industrial Co.,Ltd firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.Guangdong Bunge Building Material Industrial Co.,Ltd has professional production workshops and great production technology. movable walls we produce, in line with the national quality inspection standards, has reasonable structure, stable performance, good safety, and high reliability. It is also available in a wide range of types and specifications. Customers' diverse needs can be fully fulfilled.
  • Bunge-Office Furniture Sets Manufacture | 4-8 Person Modular Office Face To Face-2
Company Advantages
1. Bunge high quality office furniture is professionally designed by experienced experts following a strict design process. There are various colors offered for the product
2. The overall performance and durability are guaranteed by the strict quality inspection process. The product greatly highlights its easy installation
3. By using industry proven advanced inspection technology, the product is guaranteed to be high-quality. It is manufactured according to environmental protection requirements
4. Guangdong Bunge Building Material Industrial Co.,Ltd increases the added value of traditional office partitions products. It is widely used for privacy protection

4-8 Person Modular Office Face to Face Computer Tables Cubicles Workstations Furniture

Office Furniture Deatils


 

1. The aluminium profile itself is 1.2mm-1.5mm, and finished patition thickness is 60mm and 30mm.


2. The office workstations furniture is made of panel, aluminum, glass, white board and others.


3. Different layout and dimensions can be made by customer's requests.


4. Colors of the partition and tabletop are subject to customer's requirements.


5. Matching prodcucts like movable/fixed pedestal, CPU Trolly, Keyboard Tray are available with us.


6. Different combination materials of the partition will be manufactured by your own will.


7. This type is a classical one and we have exported it to many Mid-Eastern countries.


8. Easy to install.


Bunge-Find Office Computer Table Cubicle Workstation From Bunge Building

Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

Bunge-Find Office Computer Table Cubicle Workstation From Bunge Building-1

Office Furniture Advantages

1--Office table design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

Bunge-Find Office Computer Table Cubicle Workstation From Bunge Building-2


Office Furniture Finishing

There are 3 kinds of finishes to choose:

Bunge-Find Office Computer Table Cubicle Workstation From Bunge Building-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Find Office Computer Table Cubicle Workstation From Bunge Building-5


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Bunge's status has been greatly improved for its provided office partitions and professional service.
2. Based on the cornerstone of high quality office furniture, Bunge's manufactured pc workstation desk has been paid more attention than before.
3. Guangdong Bunge Building Material Industrial Co.,Ltd makes use of office furniture cabinet service concept to construct large power customer management information system. Call now!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...