Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Polyester Acoustic Panels Manufacturer  > 

sponge cinema soundproof ceiling panels material Bunge company

sponge cinema soundproof ceiling panels material Bunge company

sponge cinema soundproof ceiling panels material Bunge company

Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton packing and box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Polyester fiber acoustic panel
Feature: Reduce noise
Application: Cinema,theater,music hall
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Product Details
With a focus on details, Guangdong Bunge Building Material Industrial Co.,Ltd strives to create high-quality glass partitions.In the design and production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.Guangdong Bunge Building Material Industrial Co.,Ltd has professional production workshops and great production technology. glass partitions we produce, in line with the national quality inspection standards, has reasonable structure, stable performance, good safety, and high reliability. It is also available in a wide range of types and specifications. Customers' diverse needs can be fully fulfilled.
  • Bunge-Noise Absorbing Panels, Decorative Fabric Sound Absorption Board Cinema
Product Comparison
Guangdong Bunge Building Material Industrial Co.,Ltd provides diversified choices for customers. movable walls is available in a wide range of types and styles, in good quality and in reasonable price.With a focus on product quality, Guangdong Bunge Building Material Industrial Co.,Ltd firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls has better quality than other products in the industry, which is specifically shown in the following aspects.
  • Bunge-Noise Absorbing Panels, Decorative Fabric Sound Absorption Board Cinema-1
    v s
    Bunge-Noise Absorbing Panels, Decorative Fabric Sound Absorption Board Cinema-2
Company Advantages
1. With well selected affordable acoustic panels materials, our soundproof ceiling panels are significantly more suitable for building sound panels. The product offers a thorough partition from the ceiling to the floor
2. The strict quality control system is conducted to ensure the quality of the product. It will not be easy to swing after being reliably installed
3. The quality of the product is secured by an efficient production test team. The product becomes popular for its movability
4. Guangdong Bunge Building Material Industrial Co.,Ltd can undertake customer specified delivery. The product features a retractable performance

Decorative Fabric Sound Absorption Board Cinema Polyester Fiber Acoustic Panel


Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Professional Soundproof Panels Wall Panel Sound Insulation Supplier


Description


Polyester acoustic panel is made of high-tech hot pressing and presented by cocoon cotton shape.It can achieve the density diversity and then make sure ventilation.It achieve diverse density to ensure the ventilation, becoming the outstanding materials for the sound absorption and thermal insulation. 


Polyester fiber acoustic panel made through high-tech hot press and according to the cocoon shape.Acoustic board has a good decoration, thermal insulation, fire retardant, eco-friendly, light weight and impact resistance etc. various advantages.


Bunge-Professional Soundproof Panels Wall Panel Sound Insulation Supplier-1

Technical information


Type

Polyester Fiber Acoustic Panels

Usage

Meeting room,Office space,Home,Hospital,School,Night club,Music room,KTV,Cinema.Reading room,Hall,Library,Classroom

Size

1220mm*2420mm*9mm or Customized

Density

880g/sqm,1200g/sqm,1500g/sqm,1800g/sqm

Color

Refer to color display below

Sample

Free

OEM

Accepted

Pattern

Plain

Feature

Fireproof lever B1,E1-friend

Packaging

Carton box(can provide plastic package each pieces)

MOQ

100pcs one time

NRC

0.7-0.95

Bunge-Professional Soundproof Panels Wall Panel Sound Insulation Supplier-2

Application


Polyester fiber acoustic panels usually use in following areas:


(1)Home application ( wall acoustic, ceiling sound acoustic)


(2)Entertainment application: KTV, hotel, bar, night club, disco, cinema


(3)Workplace application: office building, meeting room, office room, studio, recording room.


(4)Industrial place application: air conditioning facilities, air compressor room, manufacture workshop.


Bunge-Professional Soundproof Panels Wall Panel Sound Insulation Supplier-3

Polyester fiber acoustic panel installing


1. Typesetting


Typeset and adjust SWAN-LAKE polyester acoustic board to certain shape on the performed section.


2. Chamfering


Either mechanical or hand-cut; recommend rigid steel ruler if you decide to cut by hand and you’d better use imported art blade.


3. Cutting


We have special chamfering tool to chamfer various bevel edge so as to meet different aesthetic point of view.


4. Installation


We mainly use glue such as spray glue, hot melt adhesive, white glue, glass glue, etc. (according to different surface) to stick acoustic panels onto the wall. For flat cement wall, you may install the boards directly with white glue and gun nail, which is glue-saving and time-saving. Pasting sing-side glue on the based surface is strongly suggested as well as layering process.


Bunge-Professional Soundproof Panels Wall Panel Sound Insulation Supplier-4

Our Service
Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   More than 500 square meters, free sample.


   Quantity up to 800 square meters, discount 500 USD.


   More than 1500 square meters, extra installing tools.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Professional Soundproof Panels Wall Panel Sound Insulation Supplier-5

FAQ


Q1: How to install those panels ?


A:Use glue or universal glue; and also can use neil to fix it 


Q2: What’s the package?


A: Carton 


Q3: How to get a accurate quotation from u


A: Provide us the detail of the product, such as model, core material, surface etc.


Q4: How to get the samples?


A: Most of the samples are free, hope you can bear the postage.


Q5: What’s the shipping cost from China to your country? polyester fiber acoustic panel


A:We can send the product to your port or door address by sea or airplane. Please kindly tell us your nearest port or address with postcode. We have reliable shipping agent to insure the safe, convenient and timely delivery.


Q6: How to check imported charges or tax ?


A:Consult your Customer. tell them product HS code:

Polyester fiber series is 392069.

 

Q7: Payment terms, MOQ, warranty, FOB...


A: Payment terms 30% down payment with order by T/T, the balance of 70% to be paid on delivery


Minimum order quantity: 100 Square Meters, FOB Guangzhou.


Delivery time :20days after receipt of formal order and 30% deposit.


Warranty:12 months following delivery. We offer online service 24 hours all day long, Skype, Email etc .You can contact us any time, if urgently, please call us.

                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Now Guangdong Bunge Building Material Industrial Co.,Ltd leads in the the manufacture of soundproof ceiling panels.
2. With the QC department's support, the quality of sound deadening wall panels can be ensured.
3. All our members are working hard to build the first brand of affordable acoustic panels. Inquire online!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...