EBUNGE
Home  > PRODUCTS  > Movable Walls  > Operable Partitions  > 

Soundproof Material Sliding Aluminium Track Operable Wall Partition for Restaurant

EBUNGE
EBUNGE
EBUNGE
Soundproof Material Sliding Aluminium Track Operable Wall Partition for Restaurant-EBUNGE
Soundproof Material Sliding Aluminium Track Operable Wall Partition for Restaurant-EBUNGE
Soundproof Material Sliding Aluminium Track Operable Wall Partition for Restaurant-EBUNGE

Soundproof Material Sliding Aluminium Track Operable Wall Partition for Restaurant

Model
Sereis 65
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
MDF board case
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable partition wall
Feature: Divide space
Partition material: Aluminium frame and mdf board
Finish: Melamine,fabric,leather,plywood and etc.
Application: Restaurant,hotel,banquet hall
General use: Office furniture
Material: Soundproof material
Function: Save space
Size: Per panel width less than 1220 mm
Color: Can be customized
Style: Modern style

Soundproof Material Sliding Aluminium Track Operable Wall Partition for Restaurant

Attention
Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-1


Project case: Dubai classroom

Year of completion : 2018

Type of product : BUNGE Type 65 movable partition wall

Finish : Mdf melamine

Panel height : 3 meter

Total quantity : 55 ㎡

Color card: Titanium white fine terry, Apple wood straight embossment


Description


Operable partition wall has manual system, no automatic system. Using operable wall, it can divide one room to two or more rooms.


Usually we will add soundproof rock wool and soundproof felt to increase soundproof feature.


There is ceiling sliding aluminium track to help hanging wall panels.No need floor track.


Per panel top and bottom parts has seal rubbers, it is to reduce noise when connecting with floor.It is about 22.5-23 mm seal rubbers.


Operable wall partition can be sliding and folding.We will use crank handle to help solid panels.


Mainly using in banquet hall,conference room,classroom,ballroom,office,exhibition hall,meeting room,hotel,restaurant and etc.



Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-2Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-3Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-4
Technical information



SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB



Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-5

Surface


Acoustic partition wall has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-6Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-7

Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-8

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-9Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-10

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-11

Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-12Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-13

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-14

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-15Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-16

Bunge-Find Operable Partition Walls Soundproof Material Sliding Aluminium Track-17


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...