Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Perforated Wooden Acoustic Panels Factory  > 

sound suppression panels mm materiral Bunge Brand sound deadening panels

sound suppression panels mm materiral Bunge Brand sound deadening panels

sound suppression panels mm materiral Bunge Brand sound deadening panels

Model
BG perforated acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton,as requested.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Perforated acoustic panels
Feature: Sound absorbing
Finish: Melamine,veneer
Application: Hotel,banquet hall,conference room,office
General use: Sound proofing materials
Material: MDF
Function: Noise reduction
Size: 2440*1220,1220*600 mm or as requested
Color: Can be customized
Style: Modern
Product Details
Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls is of exquisite workmanship, which is reflected in the details.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market.Closely following the market trend, Guangdong Bunge Building Material Industrial Co.,Ltd uses advanced production equipment and manufacturing technology to produce movable walls. The product receives favors from the majority of customers for the high quality and favorable price.
  • Bunge-Professional Acoustic Soundproofing Panels Acoustic Panels For Noise Reduction
Application Scope
Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition is commonly used in the following industries.Guangdong Bunge Building Material Industrial Co.,Ltd is dedicated to solving your problems and providing you with one-stop and comprehensive solutions.Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.
  • Bunge-Professional Acoustic Soundproofing Panels Acoustic Panels For Noise Reduction
Company Advantages
1. Bunge sound deadening panels is manufactured by using world class raw material and latest technology as per the international standards. Made of high-efficiency fireproof material, it is noted for its efficient fire prevention function
2. Brand-new noise reduction panels promotes the using effect especially in some occasions including sound suppression panels. A magnetic strip is applied to the product to ensure strong functionality
3. After continuous innovation and perseverance, this product wins a good reputation in the industry. Equipped with a sealing device, the product is praised for its tight sealing performance

Wooden MDF Veneer Perforated Acoustic Panels for Auditorium Sound Absorption

Perforated Acoustic Panels Features

1 Perforated acoustic panel is a kind of resonance absorption material with holes through on the quality MDF board.


2 Perforated acoustic panel has strong selection on the sound spectrum and particular great performance on the middle and low frequency.


3 Perforated acoustic panels filled with the acoustic cotton at the back side space of the acoustic panel, it has better performance on the middle and high frequency.


4 The holes diameter and pitch can be custom made.


5 Strong impact resistance, excellent decorate performance, elegant color, especially work for wooden construction.

Bunge-Professional Acoustic Soundproofing Panels Wooden Acoustic Panels Manufacture

Technical Information

1.Structure

Basic Material ,Finish&Back Finish

2.Basic Material

E1 MDF,FR MDF ,MgO Combination Board etc.

3.Surface

Melamine ,Natural Wood Veneer,Paint,etc.

4.Back Finish

Black Acoustic Felt

5.Standard  Size

L600xW600mm,L1200xW600mm(alternate lengths and widths are available)

6.Standard Thickness

12/15/18mm

7.Distances of two holes

8/8mm,16/16mm,32/32mm

8.Diameter of holes

1,2,3,4,5,6,8,10,12mm,etc

9.Standard Pattern

8-8-1,16-16-3,16-16-6,32-32-6,etc

10.Fire rate

Can meet China Standard Class B1 and BS476 Part 7 Class 1

11.Eco level

Can meet China and EU Standard Class E1

12.Applications

Gymnasium,hotels,exhibition centers,schools,studio etc.

13.Customization

Can be Customized

14.Acoustic Principe

Resonance Absorption

15.Application

Auditorium/Dancing Hall/Office,etc.

Bunge-Professional Acoustic Soundproofing Panels Wooden Acoustic Panels Manufacture-1

Perforated Acoustic Panels Applications

1.Studios, recording rooms, listening rooms, rehearsal rooms and more professionally interspace timbre projects.


2.Theaters, indoor gymnasiums, discos, KTV rooms and more performance and entertainment location.


3.Meeting rooms, offices, halls, hotels and more sound absorption and secrecy projects.


4.Air-port, railways, bus-stops, workshops and more noise reduction projects.


Bunge-Professional Acoustic Soundproofing Panels Wooden Acoustic Panels Manufacture-2

Perforated Acoustsic Panels Performance

Acoustic absorption is usually defined in terms of an absorption coefficient(usually denoted by theGreek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it.


α=1 means that the material absorbs all sound energy incident on it and reflects none. Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.
 
As you can see our Testing report show that our products have a very good performance in a
large range of application.

Bunge-Professional Acoustic Soundproofing Panels Wooden Acoustic Panels Manufacture-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several perforated acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the perforated acoustic panels in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-Professional Acoustic Soundproofing Panels Wooden Acoustic Panels Manufacture-4



Company Features
1. Bunge has come to eyes of international market and got a good start.
2. With a professional production and R&D foundation, Guangdong Bunge Building Material Industrial Co.,Ltd is a leader in the development of sound deadening panels.
3. Guangdong Bunge Building Material Industrial Co.,Ltd tries to structure sound suppression panels as its service ideology. Call!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...