Home  > PRODUCTS  > Acoustic Panels  > Grooved Wooden Acoustic Panels  >  Sound Proofing Building Material Wooden Grooved Acoustic Wall Panels for Auditorium
Sound Proofing Building Material Wooden Grooved Acoustic Wall Panels for Auditorium

Sound Proofing Building Material Wooden Grooved Acoustic Wall Panels for Auditorium

Model
BG grooved acoustic panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Product name: Wooden grooved acoustic panels
Feature: Sound proofing
Aluminium frame thickness: 12,15,18 mm
Partition material: Black fleece
Finish: Melamine,Veneer,MDF
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF+Melamine
Function: Fireproof and eco-friendly
Size: 2440*133 mm,2440*197 mm
Color: Can be customized
Style: Modern

Sound Proofing Building Material Wooden Grooved Acoustic Wall Panels for Auditorium

Wooden Grooved Acoustic Panels Deatils


 

1. Basic mterial : It is made of high density moistureproof and mildewproof board,the thickness is 9mm,12mm,15mm or 18mm.It is also acceptable to use the other board according to the customers' requirement.


2. Facing : Melamine facing,color chosen according to the company's color board.


3. Sound absorption thin felt : It is black,affixed to the back of the sound absorption board,nonflammable and sound absorption.


4. Batten width : 133 or 197 mm,or made according to customers' requirement.


5. Batten length : 2440mm at maximum

.

6. Acceptable tolerance : For width it is 0.1mm,for length it is 2mm.


7.Combination : 90 degree angle for the rabbet and notch,batten length is made according to the need.



Technical Information
Grooved Wooden Acoustic Panel
1.StructureBasic Material ,Finish&Back Finish
2.Basic MaterialE1 MDF,FR MDF ,MGO Combination Board etc.
2. Front FinishMelamine ,Natural Wood Veneer,Paint,etc.
3. Back FinishBlack Acoustic Felt
4.Standard Size2440*133 , 2440*197mm,etc.
5.Standard Thickness12/15/18mm
6. Standard Pattern13-3,14-2,28-4,59-5,etc.
7. Installation1.Lightweight steel keel system2.Wooden batten system
8. Fire rateCan meet China Standard Class B1 and BS476 Part 7 Class 1
9. Eco levelCan meet China and EU Standard Class E1
10.ApplicationsGymnasium,hotels,exhibition centers,schools,studio etc.
11.Is customizedCan be Customized


Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop

etc.


Wooden Grooved Acoustic Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.



Installation Methods

A)Preparation


1.The place of installation must be dry,with the lowest temperature no less than 10 degrees celsius.


2.the acoustic panels to be installed must be placed in the place of installation for at least 48h in  order to adapt the indoor environment.


3.After installation ,the largest humidity changing rate of the place of installation should be between 40%-60%.


4.The distance between each wood keel must be less than 500mm and that between each light steel keel should no more than 600mm.


B)Installation


1.Confirm the place of installation ,determine the horizontal and vertical lines and the reserved measurements for the electric wire socket ,pipes.etc.


2.Calculate the actual construction measurements and cut the part of acoustic panels if needed.


3.Start to install and follow the rules:from left to right,from bottom too top.for horizontally installation.make the grooves up;for the vertical installation,make the tougues on the right.for real wood veneer acoustic panels that have requirements on the direction of the stripes,the panels should be installed according to the pre-marked sequence numbers.


C)Installation system


1.Lightweight steel keel system


2.Wooden batten system



                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
社媒暂无评论
Contact