Solid Aluminum Frame Double Glazed Fixed Glass Partition Walls
Material | Panel :melamine laminated MDF, Veneer surfaces are protected with melamine board Can be with different color, referring to the color sample |
Finishing | Smooth surface finish / FABRIC Environment-friendly PE painting Detailed finishing process ensuring the uncompromised quality and consistent beauty |
Accessory | Aluminum frame, etc. |
Specific Use | Company receptions, hotel and so on |
Trade Term | FOB, CIF, CIF, EXW, etc. |
Payment Terms | T/T, L/C, Western Union, PayPal, etc. |
MOQ | 5 Piece/Pieces Better price for more Trial Order |
Packing | Knocked-down packing(CKD), use standard export carton with foam inner to protect goods |
Delivery Date | 25—30 days |
Supply Ability | 1000 Piece/Pieces per Month accept mixed order |
Transportation | Ship, air, express, mixed, etc., |
Assembling | Technical director, field installation |
Special service | Accept both mixed and small order; |
1.Double or single layers solid glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.
2.Super Wire Installation Function to meet the systematical needs of any working places.
3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs.
4.Adapt to kinds of thickness of glass partitions to provide the best cost performance.
5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.
6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.
7. Special sealing aluminum design offers adjustable function of the solid glass partition.
8. The aluminum bar design between the connection of the double glass produces effect sound insulation
1. A certain degree of privacy is achieved.
2. Can reduce the level of communication between staff.
3. Completely see-through, let in light and display who is in the room.
4. Fixed glass partitions panels provide a very modern and contemporary look, just choose different color of glass or different photos and word on the fixed glass partitions panel.
5. Provide stability and offer a preventative measure to deal with acoustic and visual distractions.
6. Can provide a much better solution than the alternatives, such as permanent study walls or temporary screens.
7. A wise choice to divide up the floor space in an office.
8. Specialized plastic injection channel is set up at angle joint to ensure that the internal and back of the angle joint is sealed effectively, and strengthen the angle.
9. Internal and external continuous glass sealing strip can seal better.
10. Special angle steel sheet enhances the angle quality of the hanging arm of the frame and fan angle.
1. OEM Service.
2. Design according to the customers' requirements.
3. 13 years' professional experience in research, manufacturing and marketinging, we have had various kinds of the products,such as the aluminum fixed glass partitions,sliding glass partitions,movable wall,office furniture and some acoustic wall panels. We have our own factory and showroomin Guangzhou,so we can save the mould fees and delivery time for the customer for lots of products.
4. Our morden deep processing center can provide machining such as Cutting, punching, drilling and tapping, etc.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.