Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

sliding partition walls wooden modern lightweight Warranty Bunge

sliding partition walls wooden modern lightweight Warranty Bunge

sliding partition walls wooden modern lightweight Warranty Bunge

Model
85 mm sliding partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding
Product Comparison
Bunge Building Decoration Engineering is certified by various qualifications. We have advanced production technology and great production capability. movable walls has many advantages such as reasonable structure, excellent performance, good quality, and affordable price.In the production, Bunge Building Decoration Engineering pays attention to environmental protection. We implement fine processing on products based on the safe, eco-friendly, durable and solid materials. movable walls enjoy a good reputation in the market for the features including solidity, durability, safety and no pollution.The movable walls of Bunge Building Decoration Engineering has been improved greatly in the following aspects.
  • Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding
    Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-1
Product Details
With a focus on product quality, Bunge Building Decoration Engineering strives for quality excellence in the production of movable walls.In the design and production, Bunge Building Decoration Engineering pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.Closely following the market trend, Bunge Building Decoration Engineering uses advanced production equipment and manufacturing technology to produce movable walls. The product receives favors from the majority of customers for the high quality and favorable price.
  • Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-2
Company Advantages
1. The production process of Bunge sliding room dividers complies with the international standards. Defects will not be founded in the product after it is strictly inspected
2. It is widely praised for its various special features and superb performance.
3. Since we have been concentrating on high quality product, this product has been ensured in terms of the quality. It adopts the high-performance MDF board and rockwool panel
4. This product is extensively demanded in the market with huge growth prospects. The product can far reach from one wall to another wall

Customized Melamine Finish Acoustic Operable Folding Sliding Partition Walls

Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm sliding partition walls ONLY FOR $85.

 

85 mm sliding partition walls ONLY FOR $98.

 

100 mm sliding partition walls ONLY FOR $118.

 

125 ultra-high system sliding partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of sliding partitions walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The operable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-2
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-4

Components of Sliding Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the acoustic sliding partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the acoustic sliding partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of restaurant sliding partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-5
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-6
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-7

Parking Styles of Sliding Partition Walls

As you know, when we do not use the restaurant sliding partition walls, we can park them to the parking area. Actually there are many parking styles for the restaurant sliding partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-8
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-9
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-10



Different Finishes of Sliding Partitions Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-11
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-12
Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of restaurant sliding partition walls. The sliding partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the restaurant sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Sliding Room Dividers Customized Melamine Finish Acoustic Operable Folding-14



Company Features
1. We are under strictly management to produce sliding room dividers with high technology.
2. Establishing and completing quality control system are beneficial to the production of a high quality room divider wall.
3. To establish the service philosophy of sliding partition walls is the base of Guangzhou Bunge Building Decoration Engineering Co., Ltd's work. Inquiry!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...