Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

sliding partition walls tracks sliding room dividers proof company

sliding partition walls tracks sliding room dividers proof company

sliding partition walls tracks sliding room dividers proof company

Model
85 mm meeting room partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Meeting room partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Details
folding partition's details are presented below. They help better know the product. Bunge Building Decoration Engineering learns from domestic and foreign advanced management concepts and production techniques. We run a strict and perfect procurement chain and select solid and durable materials to produce movable walls. Compared with similar products, they are stronger in hardness, higher in toughness, and longer in service life. They are affordable, attracting many buyers. Bunge Building Decoration Engineering's folding partition is commonly praised in the market due to good materials, fine workmanship, reliable quality, and favorable price.
  • Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable
Application Scope
Bunge Building Decoration Engineering's glass partitions can be used in a variety of industries. Bunge Building Decoration Engineering always adheres to the service concept to meet customers' needs. We are committed to providing customers with one-stop solutions that are timely, efficient and economical. Bunge Building Decoration Engineering's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.
  • Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable
Company Advantages
1. With the assistance of the professionals, the production of Bunge sliding partition walls is highly efficient and accurate. The surface of the product can be arbitrarily decorated by customers
2. sliding walls residential makes sliding room dividers to be operated well. The product features a retractable performance
3. Our room divider wall have won a high admiration and is widely trusted at home and abroad for its well-produced crafts. The product is found to have good sound insulation
4. The growth of Bunge in sliding wall industry profits by the considerate service and qualified sliding partition doors. It adopts the convenient hanging system without the floor track


Decorative Wooden Sound Proof Operable Partition Walls for Meeting Room


Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm meeting room partitionsONLY FOR $85.

 

85 mm meeting room partitionsONLY FOR $98.

 

100 mm meeting room partitionsONLY FOR $118.

 

125 ultra-high system meeting room partitionsONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-1

Product Description


  •   Extensive worldwide sales network that has proved that meeting room partitions work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-2
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-4

Components of Meeting Room Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the meeting room partitions with wheels.

Wheels/Rollers:  It is the carrier for the meeting room partitions,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the meeting room partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-5
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-6
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-7

Parking Styles of Meeting Room Partitions

As you know, when we do not use the meeting room partitions, we can park them to the parking area. Actually there are many parking styles for the meeting room partitions, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-8
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-9
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-10



Different Finishes of Meeting Room Partitions
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-11
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-12
Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of meeting room partitions. The meeting room partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-High-quality Sliding Wall Dividers | Decorative Wooden Sound Proof Operable-14



Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd has specialized in sliding room dividers industry for years and has supplied to lots of famous customers.
2. Bunge strengthens the technology of research and development of room divider wall which satisfies the needs of different customers.
3. All employees of Bunge Building Decoration adhere to a proactive attitude and are always ready to provide satisfactory and honest service to all customers. Get info!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...