Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

sliding partition walls tracks aluminum church Bunge Brand sliding room dividers

sliding partition walls tracks aluminum church Bunge Brand sliding room dividers

sliding partition walls tracks aluminum church Bunge Brand sliding room dividers

Model
85 mm office partition walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
Color: Can be customized
Style: Sliding
Product Comparison
Bunge Building Decoration Engineering has professional production workshops and great production technology. glass partitions we produce, in line with the national quality inspection standards, has reasonable structure, stable performance, good safety, and high reliability. It is also available in a wide range of types and specifications. Customers' diverse needs can be fully fulfilled.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market.Compared with other products in the same category, glass partitions has outstanding advantages which are mainly reflected in the following points.
  • Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office
    Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-1
Company Advantages
1. A magnetic strip is applied to the product to ensure strong functionality. Bunge focus on researching and developing new technology to produce products makes us follow the market trend to satisfy customers’ needs.
2. Due to its excellent properties like sliding partition walls, sliding room dividers is applied widely among sliding walls residential field. The product finds its wide use in the banquet hall, conference room, office, etc
3. According to customer needs, Guangzhou Bunge Building Decoration Engineering Co., Ltd can provide fast and accurate flexibility of production methods. There are various colors offered for the product


Aluminum Frame Decorative Modern Folding Sliding Office Partition Walls


Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm office partition walls ONLY FOR $85.

 

85 mm office partition walls ONLY FOR $98.

 

100 mm office partition walls ONLY FOR $118.

 

125 ultra-high system office partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-1

Product Description


  •   Extensive worldwide sales network that has proved that our office partition walls work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-2
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-4

Components of Office Partition Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the office partition walls with wheels.

Wheels/Rollers:  It is the carrier for the office partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the office partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-5
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-6
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-7

Parking Styles of Office Partition Walls

As you know, when we do not use the sliding office partition walls, we can park them to the parking area. Actually there are many parking styles for the office partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-8
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-9
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-10



Different Finishes of Office Partition Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-11
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-12
Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of office partition walls. The sliding partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the sliding partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Room Divider Wall | Aluminum Frame Decorative Modern Folding Sliding Office-14



Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd is a pioneer in the sliding room dividers market.
2. Guangzhou Bunge Building Decoration Engineering Co., Ltd has advanced production line and professional R&D team.
3. Bunge has encouraged innovation, practicality, and the pursuit of technical and management excellence. Inquire!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...