Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

sliding partition walls decorative Bulk Buy proofing Bunge

sliding partition walls decorative Bulk Buy proofing Bunge

sliding partition walls decorative Bulk Buy proofing Bunge

Model
85 mm movable walls
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Comparison
Under the guidance of market, Guangdong Bunge Building Material Industrial Co.,Ltd constantly strives for innovation. glass partitions has reliable quality, stable performance, good design, and great practicality.With a focus on product quality, Guangdong Bunge Building Material Industrial Co.,Ltd firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.Compared with products in the same category, glass partitions has the following advantages.
  • Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture
    Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-1
Company Advantages
1. Guangdong Bunge Building Material Industrial Co.,Ltd persists to use sliding partition walls material. The product ensures a safe user experience
2. All parts of sliding room dividers is in their good status and make it for high performance. The product finds its wide use in the banquet hall, conference room, office, etc
3. This product has passed through a rigorous testing and obtained certifications. It will not be easy to swing after being reliably installed
4. The product is extensively demanded in the market due to its unsurpassable advantages. There are various colors offered for the product

Aluminum Operable Movable Partition Walls For Classroom / Meeting Room


Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.



Product Description


1- 65mm ,85mm, 100mm aluminum frame thickness panel ,Max height up to 15 meters.

 

2-Top supported without floor track or guide, only have track on the ceiling.

 

3- clear anodized extruded aluminum tracks and frames,customized powder coated color are available.

 

4- Sound insulation certificate :STC 32db to 52db, ASTM standard of acoustic tested in HongKong.

 

5- Available in wide range of finishes, melamine ,fabric/PU leather, HPL, printing etc.

 

6- Fast delivery and Rich experiences in oversea project installation guide & supervision.


Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-1

Advantages of BUNGE Movable Walls System

  •   Economic overhead support with angle iron.

  •    Easy to setup and collect.

  •     No auxiliary storage tracks or support are required.

  •   The movable walls panels are designed to be stored at both ends or one end of the opening.

  •     Simple automatic bottom seal for efficient operation.

  •    Suitable for applications that require superior durability, soundproof and frequent use.

       Ideal for classrooms, meeting rooms or soundproof office movable partition walls.
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-2
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-3

Specifications of BUNGE Movable Walls System


SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-4


Components of Movable Wall Partitions System

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable waalls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the Movable wall ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-5
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-6
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-7



Stacking Options of BUNGE Movable Walls System



Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-8
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-9
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-10




Finishes Options of BUNGE Operable Wall Partitions System

  •    Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  •    Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  •   Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  •   Wallpaper, Vinyl, Fireproof board

  •    Acoustic panels

  • ❻   Tempered glass. etc.

Externally, most Operable Walls  panels look the same, but it’s not simply the outside which makes a good operable walls, it is what’s inside the panel which makes the difference.


Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-11
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-12
Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-13



Nice Price Products

 

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable partition walls ONLY FOR $85.

 

85 mm movable partition walls ONLY FOR $98.

 

100 mm movable partition walls ONLY FOR $118.

 

125 ultra-high system movable partition walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Professional Movable Partition Wall Moving Wall Systems Manufacture-14



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has a front-runner status when speaking of sliding room dividers.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a product R&D department, an engineering design and installation department, and a production workshop.
3. Guangdong Bunge Building Material Industrial Co.,Ltd makes use of sliding partition walls service concept to construct large power customer management information system. Check now!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...
/* 客户要求添加的 */