Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  >  sliding partition walls board lightweight Warranty Bunge
sliding partition walls board lightweight Warranty Bunge

sliding partition walls board lightweight Warranty Bunge

Model
85 mm movable walls
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Product name: Movable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: School, classroom, conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has an efficient and practical team. With the pursuit of excellence, our team members carry out strict control over every aspect, from production to sales and transportation.
  • Guangdong Bunge Building Material Industrial Co.,Ltd runs brand-new management and a thoughtful service system. We serve every customer attentively, so as to meet their different needs and develop a greater sense of trust.
  • In the future, Guangdong Bunge Building Material Industrial Co.,Ltd will continue to focus on quality and customers while pursuing excellence and building a good business reputation. We are committed to providing quality products and services for customers. We do that by taking customers as the center, by taking talents as the basis, by taking technology as the guarantee and taking quality as the soul.
  • Guangdong Bunge Building Material Industrial Co.,Ltd was founded in . After years of pioneering and innovation, we not only accumulate rich production experience of movable walls but also enjoy a good corporate image. We are leading the new trend of development in the Manufacturing Decoration Materials all the way.
  • Guangdong Bunge Building Material Industrial Co.,Ltd's products are sold well in China and are exported to North America, Eastern Europe, and Southeast Asia.
Application Scope
folding partition produced by Guangdong Bunge Building Material Industrial Co.,Ltd is mainly used in the following fields.Guangdong Bunge Building Material Industrial Co.,Ltd has been engaged in the production of movable walls for many years and has accumulated rich industry experience. We have the ability to provide comprehensive and quality solutions according to actual situations and needs of different customers.Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.
  • Bunge-Professional Sliding Wall Commercial Partition Walls Supplier
Company Advantages
1. Our sliding room dividers are made with sliding partition walls. It adopts the high-performance MDF board and rockwool panel
2. It is bestowed with the features like excellent quality and user-friendly performance. It is highly recognized for its excellent thermal insulation property
3. The product has a certified quality and a stable and reliable performance. The product features a retractable performance
4. The product becomes very popular with its marked features among customers in the industry. The product can far reach from one wall to another wall

Leather Finish Operable Movable Partition Walls with Sliding Tracks System


Bunge-Find Sliding Room Dividers Operable Movable Partition Walls

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm movable walls ONLY FOR $85.

 

85 mm movable walls ONLY FOR $98.

 

100 mm movable walls ONLY FOR $118.

 

125 ultra-high system movable walls ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-1

Project Case


  Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-2  uploads/www.acoustic-partition.com/images/15465108879771.png

Project site: India

Model: BUNGE 85 mm movable walls

Width: 3*10550 mm,1*6900 mm

Height: 3760 mm

Total:  4 sets, 145 square meters

Finish: Melamine

Color: CS-3087

 ◆Product Description
  • ◆  No rail suspension: the movable walls have no floor tracks,just install the tracks on the ceiling.

  •   Stable an safe: stable and reliable after installing the movable walls, not easy to swing.

  •   Sound insulation and environmental protection: the movable walls can reduce the noise, sound insulation effect is good.

  •   Insulation and energy saving: excellent thermal insulation performance, according to different occupancy rates, the large space is divided into small spaces to reduce air conditioning power consumption;

  •   Efficient fire prevention: The movable wall is made of high-efficiency fireproof material and has good fireproof performance;

  •  Beautiful and generous: the surface is arbitrarily decorated, and can be combined with the interior decoration effect;

  • ◆ Retractable and flexible: the partition is freely retractable and flexible, and one person can complete the whole process of partitioning;

Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-4
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-5
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-6

Components of Movable Walls

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable waalls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the Movable wall ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-7
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-8
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-9

Parking Styles of Movable Walls

As you know, when we do not use the movable walls, we can park them to the parking area. Actually there are many parking styles for the movable walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-10
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-11
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-12



Different Finishes of Movable Walls
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-13
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-14
Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-15
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of movable walls. The movable partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the movable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Find Sliding Room Dividers Operable Movable Partition Walls-16


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd can be counted as an international leader in the field of sliding room dividers.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has an independent production base for various room divider wall products development, production.
3. sliding partition walls is Guangdong Bunge Building Material Industrial Co.,Ltd original service theory, which fully shows its own superiority. Ask!

                                   Melamine ,natural wood veneer,paint,etc                                    

Product Message
社媒暂无评论
Contact
/* 客户要求添加的 */