Home  > PRODUCTS  > Movable Walls  > Folding Partitions  > 

Sliding folding partition in room partition board melamine movable wooden partition wall for banquet

Sliding folding partition in room partition board melamine movable wooden partition wall for banquet

Model
85mm folding partition wall
Brand Name
EBUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T
Delivery Time
7-20 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton packing with box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding movable partition wall
Feature: Soundproof,movable
Aluminium frame thickness: 85mm
Finish: Melamine,fabric,leather,plywood and etc
Application: Banquet hall,conference room,classrom,hotel
General use: Space divide
Material: Aluminum with MDF
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Eco-friendly divide space
Size: Customized
Color: Can be customized
Style: Modern style

Sliding folding partition in room partition board melamine movable wooden partition wall for banquet


product-EBUNGE-sliding folding partition in banquet-img

Products Description:

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.

product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)

Finish:

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...