Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  > 

sliding fixed glass partition Bunge Brand

sliding fixed glass partition Bunge Brand

sliding fixed glass partition Bunge Brand

Model
Series 83
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Standard Sealed Wooden Case+ Plywood For Glass Panel
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Solid glass partition wall
Application: Conference room,office and etc
General use: Office furniture
Material: AluminumFrame,wooden,glass
Function: Divide space
Size: Panel thickness 83 mm
Color: Multi color
Style: Fix glass partition wall
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has experienced professionals to guide product R&D and production, which provides a strong guarantee for the high quality of products.
  • Guangdong Bunge Building Material Industrial Co.,Ltd always focuses on customers' needs and strives to meet their needs over the years. We are committed to providing comprehensive and professional services.
  • With the main focus on customers, Guangdong Bunge Building Material Industrial Co.,Ltd takes a proactive approach to seek development. We always put customers and services first, which is the reflection of the core value. Our commitment is to provide customers with efficient and high-quality services.
  • Guangdong Bunge Building Material Industrial Co.,Ltd was established years ago. With the fearless spirit, we actively try new things and explore the market. We win honors one after another and enjoy a good corporate image in the field of Manufacturing Decoration Materials .
  • Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls are not only supplied to various regions in China, but also exported to different overseas countries and regions. And they are very popular and influential in the domestic and foreign market.
Company Advantages
1. glass partition as an important product in its industry should be designed with glass door partition. There are various colors offered for the product
2. The product is thoroughly inspected by our QC team to rule out every possibility of defects. Tracks of the product are made of high-quality anodized aluminum 6063-T5
3. Every product undergoes a strict control process to ensure the best quality. The product finds its wide use in the banquet hall, conference room, office, etc
4. Guangdong Bunge Building Material Industrial Co.,Ltd now has its own professional transport team to ensure timely delivery of products to customers. Defects will not be founded in the product after it is strictly inspected
5. The quality of glass partition is assured by our strict quality control system. It adopts the high-performance MDF board and rockwool panel

Demontable Office Tempered Glass Partition Wall with Aluminium Frame


Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Professional Glass Partition Glass Door Partition Supplier

Description


The glass partition products can be dismantled , repeated use, the materials of the partition system is a green building materials and environment-friendly materials.


The door, windows, modules entity, the location of the glass partition can be changed to suite your need, you can regroup and then use the materials after disassembly, component damage is not likely to occured 

even after regrouping or disassembly, so the glass partition system can greatly reduce costs for any office relocation.The installation of the glass partition is faster than ordinary wall.


Glass partition can be fire-resistant , compartment system is made by metal structure, glass, color steel plates etc , which also could be fire-resistant. While the compartment system is of steel structure system, the fire-resistance could be or 30 min, 60 min or a longer time.


Bunge-Professional Glass Partition Glass Door Partition Supplier-1


Technical information

Product Name

Office glass fixed partition

Blind

remote control blind and manual blind are available

Shape

L shape,linear shape,straight shape

Size(mm)

customized 

Color

More than 60 colors available

Glass

Double glass,single glass,frosted glass(10/12mm)

Partition Material

Aluminum frame+ panel/ glass /fabric / steel board

Desktop Seal edge

PVC/ABS

Accessories

Famous brand accessoriess

Products Character

Anti-Water, Anti-Scratch, Anti-Dirty

Packing

Standard export packing

Others

OEM,customized available


Bunge-Professional Glass Partition Glass Door Partition Supplier-2


Feature


1. Glass partition wall could be turned over 180 degree in order to adjust the line of sight and save energy.


2. The special structure design dose not only help to install easily and efficiently, but conduce to disassemble conveniently and replace the profile (type material), panels, etc.


3. The repeated utilization ratio of aluminum alloy profile could get to 90% above.


4. The partition system adopts high quality rubber seal without any glue. There is no dust and hazardous substance to pollute the environment and clean easily.


5. The partition system could be connected with buffer transition to meet various needs of engineering decoration and office facility.


Bunge-Professional Glass Partition Glass Door Partition Supplier-3


Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 63,more than 200 square meters, free sample.


   Series 80,quantity up to 500 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Professional Glass Partition Glass Door Partition Supplier-4

FAQ


Q1: Do you provide the design solution and drawings?


Yes, sure. We can design the systems you need to match different wall systems.


Q2: What is the standard size of your windows and doors? 

Our product is CUSTOMER MADE. We always manufacture windows and doors according to buyer's dimensions.


Q3: What is your warranty ? What do we do in case of problems? 


5 years quality warranty is provided,including frame unfading nor peel-off, hardware and accessories working properly under correct operation.In case of our quality problem, we will provide replacement by international courier.


Q4: What kinds of hardware can you supply ? 


Commonly Germany brand,China top brand and Australia brand,and other brands are available.


Q5: What is your MOQ order? 


10 piece is accepted. And the price is relative to the quantity you order.


Q6: What is your payment terms? 


30% - 50% of total amount by T/T as deposit when confirmed the order and balance paid by T/T  before loading container.


Q7: What's the delivery time? 


15 days for the standard color and 35 days for the customized. It depends on the details.



Company Features
1. Being exceptional in producing top quality glass partition, Bunge has turned into a superstar manufacturer in the market.
2. Guangdong Bunge Building Material Industrial Co.,Ltd has a professional design team to design the most unique glass partition.
3. Guangdong Bunge Building Material Industrial Co.,Ltd will provide excellent quality and professional service. Contact us!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...