Home  >  Quality PRODUCTS For sell  >  Office Furniture Exporter  > 

secretary table office partitions meeting saving Bunge company

secretary table office partitions meeting saving Bunge company

secretary table office partitions meeting saving Bunge company

Model
BG modular office workstations
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Modular office workstations
Feature: Eco-friendly
Aluminium frame thickness: 2 CM/4.5 CM/2.0 CM/1.8 CM
Partition material: Aluminum and board
Finish: Melamine,fabric,veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF
Function: Office Work,office partitions,office dividers,office standing
Size: Accept customized
Color: Can be customized
Style: Modern
Enterprise Strength
  • Based on the implementation of advanced talent reserve strategy, Guangdong Bunge Building Material Industrial Co.,Ltd introduces a large number of outstanding technical and management talents. They contribute to our development.
  • With a focus on service, Guangdong Bunge Building Material Industrial Co.,Ltd improves services by constantly innovating service management. This specifically reflects in the establishment and improvement of the service system, including pre-sales, in-sales, and after-sales.
  • With the main focus on honesty, Guangdong Bunge Building Material Industrial Co.,Ltd pays great attention to mutual benefit and common development. We carry forward the enterprise spirit, which is to be aggressive and united and to pursue excellence. Guided by the market and guaranteed by technology, we strive to become a modern enterprise integrating scientific research, production, and service. Our goal is to continuously provide customers with quality products and professional services.
  • In the past years of development, Guangdong Bunge Building Material Industrial Co.,Ltd has learned advanced production technology through different channels and has accumulated advanced development experience. Currently, we have rich experience in the production of movable walls and great production capability, which is close to the international level.
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a marketing network covering the whole country, which contributes to the rapid market development.
Product Details
With the pursuit of excellence, Guangdong Bunge Building Material Industrial Co.,Ltd is committed to showing you unique craftsmanship in details.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market.Closely following the market trend, Guangdong Bunge Building Material Industrial Co.,Ltd uses advanced production equipment and manufacturing technology to produce movable walls. The product receives favors from the majority of customers for the high quality and favorable price.
  • Bunge-Office Partitions Factory Direct Sell Office Partitions Oem Modular Office
Company Advantages
1. The design of high quality office furniture is very innovative following the latest design trends in the industry.It displays a gorgeous and delicate appearance
2. The quality of this product can not be assured without the efforts of each Bunge staff. The product greatly highlights its easy installation
3. Its quality is examined under the supervision of our skilled quality experts. Equipped with a sealing device, the product is praised for its tight sealing performance
4. Thanks to the good comments from our long-term partners, Bunge has attracted more attention in the world. The product is found to have good sound insulation
5. Experienced quality check team are equipped in Bunge to be dedicated into producing office partitions with high quality. The product features a retractable performance

Factory Direct Sell Office Partitions OEM Modular Office Cubicles Workstations Furniture

Office Furniture Deatils


 

1. The aluminium profile itself is 1.2mm-1.5mm, and finished patition thickness is 60mm and 30mm.


2. The modular office workstation is made of panel, aluminum, glass, white board and others.


3. Different layout and dimensions can be made by customer's requests.


4. Colors of the computer workstation partition and tabletop are subject to customer's requirements.


5. Matching prodcucts like movable/fixed pedestal, CPU Trolly, Keyboard Tray are available with us.


6. Different combination materials of the office partitions will be manufactured by your own will.


7. This type is a classical one and we have exported it to many Mid-Eastern countries.


8. Easy to install.


Bunge-Find Factory Direct Sell Office Partitions Oem Modular Office Cubicles

Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

Bunge-Find Factory Direct Sell Office Partitions Oem Modular Office Cubicles-1

Office Furniture Advantages

1--Office workstations furniture design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

Bunge-Find Factory Direct Sell Office Partitions Oem Modular Office Cubicles-2


Office Furniture Finishing

There are 3 kinds of finishes to choose:

Bunge-Find Factory Direct Sell Office Partitions Oem Modular Office Cubicles-3


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

Saving Space Office Furniture Contemporary Office Cubicles 2-6 Seat Office Partition Workstations


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

Bunge-Find Factory Direct Sell Office Partitions Oem Modular Office Cubicles-5


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. With high quality support, Guangdong Bunge Building Material Industrial Co.,Ltd is reliable by clients.
2. With advanced technologies competitiveness, Guangdong Bunge Building Material Industrial Co.,Ltd occupies a wide overseas market of office partitions.
3. high quality office furniture is Guangdong Bunge Building Material Industrial Co.,Ltd original service theory, which fully shows its own superiority. Call!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...