RTS Banquet Hall Acoustic Movable Walls Sliding Door Folding Room Partitions Manufacturer
Finished Project
Thanks for the trust from the client who comes from Vancouver.
This was a project for hotel, the client used the banquet hall operable walls to divide a big rooms into many smaller rooms, so that the people have a separate small room to entertain.
After we finished the production, we sent some video and pictures to the client to check the quality, he felt satisfied in it. In 2019 April, he received our partition walls and sent us a nice feedback.
Size: Width6520*Height2728 mm, 2 sets of walls, around 35.6 square meters.
Width4000*Height2583 mm, 5 sets of walls, around 51.7 square meters.
Finish: Melamine Surface. Color Chart: CS-31741F, a nice one.
Sliding Door Folding partitions technical information
Model | BG65 | BG85 | BG100 | Ultra-high System |
Suspension System | Hanging System, with ceiling rails | |||
Basic Thickness | 65mm | 85mm | 100mm | 100 mm |
Max Height | Max 3800 mm | Max 6000 mm | Max 8000 mm | Max 15000 mm |
Width | 800 -1230mm | |||
Floor/ceiling Sealing strength | Telescopic aluminum tube with rubber strip | |||
Side Walls Sealing Strength | Double seal tape | |||
Base Board Thickness | 9 mm | 9 mm | 12 mm | 12 mm |
Vertical Profiles | Aluminum anodised with sealing profiles | |||
Retractable Seals | Aluminum black with double rubber seals | |||
Operation | Manual System, with supplied operating handle | |||
Pass Doors | Single or Double Pass Through Door Available | |||
Weight | Approx 22-35 kg/m² | Approx 25-40 kg/m² | Approx30-48 kg/m² | Approx38-68 kg/m² |
Finish Options | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc. (Customized) |
Sliding Door Folding partitions features
1. No rail suspension: the floor has no track, just install the track on the ceiling;
2. Stable and safe: stable and reliable after partitioning, not easy to swing;
3. Sound insulation and environmental protection: sound insulation effect is good, the sound insulation coefficient can reach 53dB;
4. Insulation and energy saving: excellent thermal insulation performance, according to different occupancy rates, the large space is divided into small spaces to reduce air conditioning power consumption;
5. Efficient fire prevention: it is made of high-efficiency fireproof material and has good fireproof performance;
6. Beautiful and generous: sliding door folding surface is arbitrarily decorated, and can be combined with the interior decoration effect;
7. Retractable and flexible: sliding door folding is freely retractable and flexible, and one person can complete the whole process of partitioning;
8. Convenient collection: when closing the board, sliding door folding can be hidden in the special storage cabinet, which does not affect the overall appearance;
9. Wide range of applications: can be used in conference halls, exhibition halls, restaurants, high clean factories and offices.
Related products
1. Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.
2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.
3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.
4. Partition walls accessories: partition walls tracks and wheels.
Sliding Door Folding Partition Walls packaging
A short time of production-ONLY 5-7 DAYS
Quick and Safe Shipping
Package by Wooden Boxes
About us
Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries.
As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.