Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Operable Partitions Factory  > 

room soundproof operable partition walls flexible Bunge Brand company

room soundproof operable partition walls flexible Bunge Brand company

room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company
  • room soundproof operable partition walls flexible Bunge Brand company

room soundproof operable partition walls flexible Bunge Brand company

Model
Series 65
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Carton packing and box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition wall
Feature: Sound proofing
Partition material: Aluminium frame and mdf baord
Finish: Fabric,leather,melamine surface
Application: Conference room,office,classroom
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly Divide space
Size: 2440*133 mm, 2440*197 mm Thickness 83 mm
Color: Multi color
Style: Sliding and folding
Product Details
Guangdong Bunge Building Material Industrial Co.,Ltd pursues excellent quality and strives for perfection in every detail during the production.Guangdong Bunge Building Material Industrial Co.,Ltd introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.Guangdong Bunge Building Material Industrial Co.,Ltd's glass partitions is manufactured in strict accordance with relevant national standards. Every detail matters in the production. Strict cost control promotes the production of high-quality and priced-low product. Such a product is up to customers' needs for a highly cost-effective product.
  • Bunge-Manufacturer Of Sound Proof Partition Wall Flexible Hanging System Soundproof
Product Comparison
Guangdong Bunge Building Material Industrial Co.,Ltd has the ability to meet different needs. folding partition is available in multiple types and specifications. The quality is reliable and the price is reasonable.With a focus on product quality, Guangdong Bunge Building Material Industrial Co.,Ltd firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.Compared with other products in the same category, Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition has the following advantages.
  • Bunge-Manufacturer Of Sound Proof Partition Wall Flexible Hanging System Soundproof-1
    v s
    Bunge-Manufacturer Of Sound Proof Partition Wall Flexible Hanging System Soundproof-2
Company Advantages
1. The design of operable partition walls has turned many customers on. The product finds its wide use in the banquet hall, conference room, office, etc
2. The product is tested for functionality and safety. Multiple accessories of the product can be provided to the customers
3. Excellent service team is also a guarantee for customers to better enjoy the operable wall shopping experience. The product becomes popular for its movability
4. Our perfect packaging will be conducive to the safety of acoustic operable walls. It can divide a large space into small spaces for effective space utilization

Flexible Hanging System Soundproof Office Folding Partition Wall for Conference Room

Attention
Bunge-Find Conference Room Partition Wall From Bunge Building Decoration

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-1


Project case: Mexico function hall

Year of completion : 2018

Type of product : BUNGE Type 65 movable partition wall

Finish : Hard covered with fabric

Panel height : 3.2 meter

Total quantity : 28 ㎡

Color card: Fabric FB-27


Description


Folding partition wall is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Movable partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-2Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-3Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-4
Technical information



SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB



Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-5

Surface


Acoustic partition wall has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-6Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-7

Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-8

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-9Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-10

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-11

Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-12Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-13

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-14

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-15Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-16

Bunge-Find Conference Room Partition Wall From Bunge Building Decoration-17



Company Features
1. These years, Guangdong Bunge Building Material Industrial Co.,Ltd has achieved fast business development in operable partition walls field.
2. Bunge is designed in our advanced design lab operable wall.
3. Being a professional enterprise is the persisting goal for Bunge. Inquiry!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...