EBUNGE  > 

AI - Page Sitemap

 > 

real hall partition factory for conference room

real hall partition factory for conference room

Real hall partition factory for conference room

Model
85 mm sound proof partition
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or Western Union
Delivery Time
15-20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ,small quantity welcomed
Packing Details
Paper carton, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partitions
Feature: Sound proof
Finish: Melamine
Application: Conference room partitions
General use: Office furniture
Material: MDF+ Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: partition walls customized
Color: Optional
Style: Folding and sliding
Product Comparison
BUNGE PARTITIONS insists on the use of high-quality materials and advanced technology to manufacture movable wall. Besides, we strictly monitor and control the quality and cost in each production process. All this guarantees the product to have high quality and favorable price.BUNGE PARTITIONS's movable wall has the following advantages over other similar products.
Product Details
BUNGE PARTITIONS's folding partition is of excellent quality, which is reflected in the details.BUNGE PARTITIONS provides diversified choices for customers. folding partition is available in a wide range of types and styles, in good quality and in reasonable price.
Company Advantages
1. Each piece of EBUNGE retractable walls commercial is designed by our design department. They spend time researching, testing and experimenting with a variety of materials and techniques that best suit the scope of work for this piece of bedding.
2. Durable in use: the quality of this product is assured base on its perfect design and fine craftsmanship. Thus it can be use-durable for a long time if it is maintained properly.
3. The product is quality-assured as we have established a good quality management system to prevent any possible defects.
4. Guangdong Bunge Building Material Industrial Co.,Ltd has ability to solve and improve all possible problems for its hall partition .
5. All the staff in EBUNGE have the perseverance to the development of hall partition .

Hotel Sound Proof Acoustic Partitions Temporary Sliding Folding Walls Movable Partitions for Banquet Hall


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

real hall partition factory for conference room-1

real hall partition factory for conference room-2

real hall partition factory for conference room-3

real hall partition factory for conference room-4


 Movable Partitions Walls  technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

real hall partition factory for conference room-5


Movable Partition Walls  features


1. The   Movable Partitions walls  is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the movable partition walls can be customized, such as the size, the colors and the surfaces.

3. The  movable partition walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

real hall partition factory for conference room-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

real hall partition factory for conference room-7


Movable Partition Walls  packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

real hall partition factory for conference room-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

real hall partition factory for conference room-9






Company Features
1. As a large producer of hall partition , Guangdong Bunge Building Material Industrial Co.,Ltd occupies a large market share.
2. The factory has implemented a comprehensive production tracking management system. This system is set based on the actual situation of our factory and designed to control various variable factors throughout the production process.
3. Guangdong Bunge Building Material Industrial Co.,Ltd has been attempting to make ourselves a top brand in China's retractable walls commercial business. Call now! All of our business actions are socially-responsible business practices. The products we produced are safe to use, and we occasionally take part in social philanthropies. Call now! Through inventive processes, we provide unmatched value to our customers. We foster creative work environments where we always challenge ourselves to improve our processes and procedures. Call now!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...