Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room-EBUNGE
Home  > PRODUCTS  > 

Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room

EBUNGE
EBUNGE
Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room-EBUNGE
EBUNGE
Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room-EBUNGE
Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room-EBUNGE
Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room-EBUNGE

Movable Folding Partitions Aluminum Office Sliding Partition Walls For Meeting Room

Model
85 mm sound proof partition
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
TT or Wesetrn Union
Delivery Time
15-20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ,small quantity welcomed
Packing Details
Paper carton, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sliding partition walls
Feature: Sound proof
Finish: Melamine
Application: Conference room partitions
General use: Office furniture
Material: MDF+Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding

Ready to Ship Meeting Room Movable Folding Partitions Aluminum Office Sliding Partition Walls


Finished Project


Thanks for the trust from the client who comes from Vancouver.

This was a project for hotel, the client used the banquet hall operable walls to divide a big rooms into many smaller rooms, so that the people have a separate small room to entertain.

After we finished the production, we sent some video and pictures to the client to check the quality, he felt satisfied in it. In 2019 April, he received our partition walls and sent us a nice feedback.

Size: Width6520*Height2728 mm, 2 sets of walls, around 35.6 square meters.

         Width4000*Height2583 mm, 5 sets of walls, around 51.7 square meters.


Finish: Melamine Surface. Color Chart: CS-31741F, a nice one.



EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors

EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors-1

EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors-2

EBUNGE-Oem Movable Partition Manufacturer, Foldable Partition Doors-3


Sliding Partition Walls technical information


Model

BG65

BG85

BG100

Ultra-high System

Suspension System

Hanging System, with ceiling rails

Basic Thickness

65mm

85mm

100mm

100 mm

Max Height

Max 3800 mm

Max 6000 mm

Max 8000 mm

Max 15000 mm

Width

800 -1230mm

Floor/ceiling Sealing strength

Telescopic aluminum tube with rubber strip

Side Walls Sealing

Strength

Double seal tape

Base Board Thickness

9 mm

9 mm

12 mm

12 mm

Vertical Profiles

Aluminum anodised with sealing profiles

Retractable Seals

Aluminum black with double rubber seals

Operation

Manual System, with supplied operating handle

Pass Doors

Single or Double Pass Through Door Available

Weight

Approx 22-35 kg/m²

Approx 25-40 kg/m²

Approx30-48 kg/m²

Approx38-68 kg/m²

Finish Options

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)


EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-4

Sliding Partition Walls features


1. No rail suspension: the floor has no track, just install the track on the ceiling;

2. Stable and safe: stable and reliable after partitioning, not easy to swing;

3. Sound insulation and environmental protection: sound insulation effect is good, the sound insulation coefficient can reach 53dB;

4. Insulation and energy saving: excellent thermal insulation performance, according to different occupancy rates, the large space is divided into small spaces to reduce air conditioning power consumption;

5. Efficient fire prevention: it is made of high-efficiency fireproof material and has good fireproof performance;

6. Beautiful and generous:sliding partition walls surface is arbitrarily decorated, and can be combined with the interior decoration effect;

7. Retractable and flexible:sliding partition walls is freely retractable and flexible, and one person can complete the whole process of partitioning;

8. Convenient collection: when closing the board, sliding partition walls can be hidden in the special storage cabinet, which does not affect the overall appearance;

9. Wide range of applications: can be used in conference halls, exhibition halls, restaurants, high clean factories and offices.

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-5


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

EBUNGE-Wholesale Movable Partition Manufacturer, Style Movable Partitions | Ebunge-6


Sliding Partition Walls Walls  packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-6


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

EBUNGE-Movable Partition, Style Movable Partitions Price List | Ebunge-7




Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...