Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Top Grooved Wooden Acoustic Panels Company  > 

proofing Custom material timber sound absorbing panels Bunge absorbing

proofing Custom material timber sound absorbing panels Bunge absorbing

Proofing Custom material timber sound absorbing panels Bunge absorbing

Model
BG grooved wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton, or as requested.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Grooved wooden acoustic panels
Feature: Fire proof
Finish: Melamine,veneer
Application: Conference room,office,meeting room
General use: Sound proofing materials
Material: MDF+Melamine
Function: Noise reduction
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Modern
Product Comparison
Well-chosen in material, fine in workmanship, excellent in quality and favorable in price, Guangdong Bunge Building Material Industrial Co.,Ltd's folding partition is highly competitive in the domestic and foreign markets.In the design and production, Guangdong Bunge Building Material Industrial Co.,Ltd pays attention to the overall design and the details of the line design. movable walls has advantages such as good design, multiple functions, and outstanding performance.Supported by advanced technology, Guangdong Bunge Building Material Industrial Co.,Ltd has a great breakthrough in the comprehensive competitiveness of folding partition, as shown in the following aspects.
  • Bunge-Wall Sound Panels Wooden Acoustic Wall Boards Material For Auditorium
    Bunge-Wall Sound Panels Wooden Acoustic Wall Boards Material For Auditorium-1
Company Advantages
1. sound absorbing panels is developed with high-performance acoustic panel material materials. It adopts the high-performance MDF board and rockwool panel
2. The quality of this product has met the requirements of international standards. It can be used to save the power consumption of the air conditioning
3. Guangdong Bunge Building Material Industrial Co.,Ltd makes use of advanced technology and produces a variety of soundproof wall panels. It is widely used for privacy protection
4. Through alliances with various partners, Bunge is able to provide our customers a wide range of sound dampening panels made by the best manufacturers . The product features a retractable performance

Wooden Acoustic Wall Boards Material for Auditorium Fireproof Grooved Wooden Acoustic Panels

Grooved Wall Panels Details


Wooden timber acoustic panel introduced the advanced production equipment, according to the principle of acoustic design and has good sound absorption effect, make the reverberation time reach home of the acoustical design standard,make the sound more clear,smooth,rich stereo feeling,have all kinds of optional finishes and base material,is applicable to both solid wood decorative effect and heat preservation requirements,there is a requirement for acoustic reverberation and all kinds of games. 


Base material is commonly used for MDF (optional fire density board or other specified base material), veneer can 
choose naturalwood veneer, melamine, spray paint, fire prevention board, etc., USES the German import freudenberg fire sound-absorbing glued on the back.

Specification  Groove 3mm, Center to Center 32mm
NRC 0.8
Eco-friendlyE0
FireproofA2
InstallationAluminum keel and clips, wood frame, gun nail



 

Bunge-High-quality Sound Absorbing Wall Panels | Wooden Acoustic Wall Boards

Technical Information
Product name
Wooden Grooved Acoustic Panel
Material
MDF, magnesium board, pottery aluminium board, etc
Color
Kinds of color can be customized
Size
128*2440mm, others can be customized
Thickness
12mm, 15mm, 18mm, others can be customized
Shape
Strip
Finish
Solid wood, Aluminum plate, UV spray printed
Features
Fireproof, decoration, soundproof, sound diffusion
Fireproof
A grade for ceramic aluminium board, B1 grade for MDF.
Environmental
E1 grade
Applications
Stadium, auditorium, multi-functional hall, meeting room, studio and any other places where seek for high acoustic requirements.
Shipment
By sea or air
Delivery time
7-15 working days after receiving your payment
Payment
T/T

Bunge-High-quality Sound Absorbing Wall Panels | Wooden Acoustic Wall Boards-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop etc.


Bunge-High-quality Sound Absorbing Wall Panels | Wooden Acoustic Wall Boards-2

Grooved Wall Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-High-quality Sound Absorbing Wall Panels | Wooden Acoustic Wall Boards-3


Installation Methods

1> First fix the aluminum profile onto the wooden frame or bottom board, and their distance suggested 6about 600mm.

 

2> Filled the 32-64kg/m density acoustic foam among aluminum profiles.

 

3> Use the clips to fix the perforated acoustic panel to the aluminum profile.

 

4> When install several acoustic panel, the distance between noses to noses suggested 2-3mm.

 

5> If install the acoustic panel in the horizontal way, then the notch of the panel should face down, and it need to be fixed tight with clips. After that install pieces and pieces of acoustic panel onto the lowest one.



Bunge-High-quality Sound Absorbing Wall Panels | Wooden Acoustic Wall Boards-4




Company Features
1. Thanks to its solid economic foundation, Bunge can stand out in the market.
2. A major breakthrough in creating the sound absorbing panels has been achieved in Bunge.
3. In line with the principle of soundproof wall panels, Bunge have gradually expanded the business. Inquire online!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...