Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

proof retractable movable melamine Bunge Brand sliding room dividers supplier

proof retractable movable melamine Bunge Brand sliding room dividers supplier

Proof retractable movable melamine Bunge Brand sliding room dividers supplier

Model
85 mm banquet hall partitions
Brand Name
BUNGE
Year of Establishment
2011
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Banquet hall partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Details
The following is the section for presenting folding partition's details.This durable movable walls are made of solid materials. They have strong resistance to wear, corrosion, and radiation. They live up to the national quality control standards and enjoy high recognition in the market. Bunge Building Decoration Engineering is certified by various qualifications. We have advanced production technology and great production capability. folding partition has many advantages such as reasonable structure, excellent performance, good quality, and affordable price.
  • Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls
Application Scope
Bunge Building Decoration Engineering's glass partitions can be used in multiple scenes. Bunge Building Decoration Engineering is dedicated to solving your problems and providing you with one-stop and comprehensive solutions.With a focus on high standards and strict requirements, Bunge Building Decoration Engineering uses authentic materials to design and produce movable walls. We guarantee the quality by strictly controlling the mixed application of inferior materials in the production. They feature good design, long service life, corrosion resistance, as well as easy cleaning and installation. They are unanimously recognized by the market and have a high repurchase rate.
  • Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls
Company Advantages
1. Our management method is developing and innovating from instant to instant.The product greatly highlights its easy installation
2. The product is thoroughly checked in order to ensure that it performs without any flaws. The product ensures a safe user experience
3. It adopts the high-performance MDF board and rockwool panel. All parts of sliding room dividers,sliding partition walls is in their good status and make it for high performance.
4. Equipped with a sealing device, the product is praised for its tight sealing performance. the devotion to the quality of room divider wall,sliding walls residential helps Bunge to be a leading manufacturer in the industry.


85 mm Type Movable Sound Proof Partition Walls for Banquet Hall

Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm banquet hall partitions ONLY FOR $85.

 

85 mm banquet hall partitions ONLY FOR $98.

 

100 mm banquet hall partitions ONLY FOR $118.

 

125 ultra-high system banquet hall partitions ONLY FOR $130.

 

Please contact us for the Detailed Price.

Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-1

Product Description


  •   Reinforced aluminium frame construction for demanding condition.

  •      Wide range of banquet hall movable walls surface finishes and colors.

  •   Single or double passdoor enabling access to neighbouring rooms.

  •     The banquet hall movable partition walls stacking can be one or both ends.

  •     Top hung and floor with rubber seals achieving excellent soundproof effect.

  •    Various levels of soundproof reduction.

Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-2
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-4

Components of Banquet Hall Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the banquet hall movable partition walls cost panels with wheels.

Wheels/Rollers:  It is the carrier for the banquet hall movable partition walls,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in aluminum profiles to enhance acoustic performance of banquet hall movable partition walls.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-5
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-6
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-7

Parking Styles of Banquet Hall Partitions

As you know, when we do not use the banquet hall partitions, we can park them to the parking area. Actually there are many parking styles for the banquet hall movable walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-8
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-9
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-10



Different Finishes of Banquet Hall Partitions
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-11
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-12
Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of banquet hall movable walls. The movable walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the banquet hall partitions are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Sliding Folding Partition 85 Mm Type Movable Sound Proof Partition Walls-14



Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd is China's largest modern sliding room dividers production base.
2. Our easy operating sliding partition walls makes room divider wall more prompt and convenient.
3. Bunge series is manufactured in strict accordance with international standards.
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...