Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  >  partitions Custom wooden proofing sliding room dividers Bunge decorative
partitions Custom wooden proofing sliding room dividers Bunge decorative

partitions Custom wooden proofing sliding room dividers Bunge decorative

Model
85 mm operable partitions
Brand Name
BUNGE
Year of Establishment
2011
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Captcha

Loading verification code...

Please complete verification first

Product name: Operable partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding
Product Comparison
movable walls, manufactured based on high-quality materials and advanced technology, has reasonable structure, excellent performance, stable quality, and long-lasting durability. It is a reliable product which is widely recognized in the market. Bunge Building Decoration Engineering introduces advanced decorative production technology and uses fine workmanship in the production of various movable walls. We have various choices for styles, such as classic style, fashion style, novel style, and regular style. Moreover, art and creative design are adopted into each product.movable walls's outstanding advantages are as follows.
  • Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture
    Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-1
Company Advantages
1. It adopts the convenient hanging system without the floor track. Bunge sliding partition walls are manufactured using high quality sliding walls residential material that assurs sliding room partitions.
2. It will not be easy to swing after being reliably installed. sliding glass partition can be seen in this sliding room dividers,sliding folding walls which can movable sliding walls.
3. It is highly recognized for its excellent thermal insulation property. as a responsible room divider wall,dividers movable sliding walls manufacturer, Bunge pays more attention to the quality assurance of the product.


Hanging System Decorative Acoustic Operable Partition Walls


Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.


Nice Price Products

FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.

 

65 mm operable partitions ONLY FOR $85.

 

85 mm operable partitions ONLY FOR $98.

 

100 mm operable partitions ONLY FOR $118.

 

125 ultra-high system operable partitions ONLY FOR $130.

 

Please contact us for the Detailed Price.

 

WhatsApp:008613928983277

Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-1

Product Description


  •   Extensive worldwide sales network that has proved that our operable partitions work well worldwide.

  •   Technical advice or design is available, no matter where you located.

  •   Integrated space management and acoustic product solutions that can be more profitable and economical to use in your building environment.

  •   From your first query to the completion of the project, we are here to support.

  •   Based on years of experience in architectural and design challenges, provide industry-leading technology to solve your space problems.

  •   Unique custom applications that is flexible enough to meet the needs of any customer.

Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-2
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-3
Technical Details
SeriesBG65BG85BG100
Panel suspensionTop hung onlyTop hung onlyTop hung only
Panel thickness65mm85mm100mm
Max height4000mm6000mm18000mm
Panel width500-1200 mm500-1200 mm500-1200 mm
Face material9mm9mm12 mm
PassdoorsSingle door or Double door
Sound insulation28-38dB Rw28-42dB Rw32-50dB Rw
Finish MaterialPlywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized)

Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-4

Components of Operable Partitions

Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the operable partitions with wheels.

Wheels/Rollers:  It is the carrier for the operable partitions ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the Operable Wall Partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-5
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-6
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-7

Parking Styles of Operable Partitions

As you know, when we do not use the operable partitions, we can park them to the parking area. Actually there are many parking styles for the operable partitions, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.


Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-8
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-9
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-10



Different Finishes of Operable Partitions
  • ❶   Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  • ❷   Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  • ❸  Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  • ❹  Wallpaper, Vinyl, Fireproof board

  • ❺   Acoustic panels

  • ❻   Tempered glass, mirror etc.

Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-11
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-12
Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-13
Action Now

1.Buy 30 square meters Get 5% Discount.


2.Buy 80 square meters Get 10% Discount.


3.Get a FREE SAMPLE.


4.Support a 3 YEARS WARRANTY.


5.To be general, BUNGE Factory has 10+ years experience in the line of operable partitions. The operable partition walls we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the operable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.

Bunge-Professional Sliding Partition Doors Temporary Partition Manufacture-14



Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd is among the leading manufacturers in producing sliding room dividers.
2. Because of sliding partition walls technology, the quality of room divider wall is far more better than before.
3. Based on comparative advantages, Bunge will vigorously develop a circular economy and continuously improve the service. Ask!
Product Message

Loading verification code...

Please complete verification first

社媒暂无评论
Contact
/* 客户要求添加的 */