Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Sliding Partitions Wholesale  > 

partitions 85 church Bunge Brand sliding partition walls factory

partitions 85 church Bunge Brand sliding partition walls factory

Partitions 85 church Bunge Brand sliding partition walls factory

Model
65 mm movable partition walls
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Classroom,office,conference room
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Multi color
Style: Sliding
Enterprise Strength
  • Bunge Building Decoration Engineering has a high-quality management team, a professional management team, and a considerate service team. This provides a good guarantee for production, sales, and service.
  • Bunge Building Decoration Engineering always sticks to the tenet that we serve customers wholeheartedly and promotes the healthy and optimistic brand culture. We are committed to providing professional and comprehensive services.
  • With a focus on customer's needs, Bunge Building Decoration Engineering always adheres to the business philosophy of 'people-based, market-oriented, innovation-driven'. We constantly improve and innovate business management methods, so that we can become a high-end, innovative and excellent company.
  • Bunge Building Decoration Engineering was founded in 2009. After years of struggling in the Manufacturing Decoration Materials industry, we greatly develop the business with the improvement of production technology and enterprise value.
  • Bunge Building Decoration Engineering's products are sold well in China, Africa, Europe, Southeast Asia, and other regions, and are highly praised by domestic and foreign customers.
Product Comparison
movable walls, manufactured based on high-quality materials and advanced technology, has excellent quality and favorable price. It is a trustworthy product which receives recognition and support in the market. Bunge Building Decoration Engineering opens up new horizons based on the market. We gain inspiration from art and create value with profession. Moreover, we try to integrate aesthetic art into the design of movable walls and focus on the design and planning of product details. We guarantee that each product is classic and stylish, simple and generous by putting our wisdom and vitality into the production.Compared with other products in the same category, Bunge Building Decoration Engineering's movable walls has the following advantages.
  • Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom
    v s
    Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-1
Company Advantages
1. The mainly materials of our sliding room dividers are sliding partition walls.The product greatly highlights its easy installation
2. It is manufactured according to environmental protection requirements. room divider wall,sliding walls residential is welcomed by costumer for the great performance of sliding room partitions.
3. sliding wall has the advantages of sliding glass partition, and reduced overall cost. The product promises that there will be no scratch issues
4. Without complete quality assurance system, the sliding partition doors of Bunge could not have been so popular. It displays a gorgeous and delicate appearance
5. As a major supplier for sliding wall panels, Guangzhou Bunge Building Decoration Engineering Co., Ltd has conducted strict quality tests before shipment. Equipped with a sealing device, the product is praised for its tight sealing performance


Meeting Room Acoustical Room Dividers Classroom Movable Partition Walls

Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-1

Description


Movable wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Movable partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-2Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-3Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Movable wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-5Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-6

Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-8Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-9

Movable partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-10

Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-11Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-13


Packing & shipping


Movable partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-14Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-15

Bunge-Acoustic Partition Wall, Meeting Room Acoustic Room Dividers Classroom-16


Company Features
1. Guangzhou Bunge Building Decoration Engineering Co., Ltd is in the domestic leading position on sliding room dividers manufacture.
2. Through proficiently experienced technology, room divider wall is made to be of excellent quality.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd always put customers' needs first. Inquire online!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...