Home  >  Quality PRODUCTS For sell  >  Glass Partitions Manufacturer  >  Quality Solid Glass Partitions  > 

partition wall with glass panel temper interior Bunge Brand

partition wall with glass panel temper interior Bunge Brand

Partition wall with glass panel temper interior Bunge Brand

Model
BG aluminum glass partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 square meters
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Aluminum glass partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 4 meters
Partition material: 800 - 1200 mm
Finish: Clear glass + Melamine
Application: Conference room,office,meeting room
General use: Office furniture
Material: Aluminum+clear glass
Function: Fireproof and eco-friendly
Size: Accept customized
Color: Can be powder coated
Style: Modern
Product Details
Guangdong Bunge Building Material Industrial Co.,Ltd pays great attention to details of movable walls.Guangdong Bunge Building Material Industrial Co.,Ltd opens up new horizons based on the market. We gain inspiration from art and create value with profession. Moreover, we try to integrate aesthetic art into the design of movable walls and focus on the design and planning of product details. We guarantee that each product is classic and stylish, simple and generous by putting our wisdom and vitality into the production.movable walls, manufactured based on high-quality materials and advanced technology, has excellent quality and favorable price. It is a trustworthy product which receives recognition and support in the market.
  • Bunge-Office Glass Partition Design, 83 Mm Type Aluminum Alloy Anodized Glass
Enterprise Strength
  • Guangdong Bunge Building Material Industrial Co.,Ltd has a first-class product development team and a professional quality management team, which provides a solid guarantee for improving products.
  • While selling products, Guangdong Bunge Building Material Industrial Co.,Ltd also provides corresponding after-sales services for consumers to solve their worries.
  • Guangdong Bunge Building Material Industrial Co.,Ltd intends to be earnest, practical and efficient under the influence of enterprise spirit. We run an integrity-based and brand-rooted business, so as to achieve steady and sustainable development. We strive to improve the brand reputation and popularity. We are dedicated to providing more quality products and becoming a modern enterprise favored by customers.
  • Guangdong Bunge Building Material Industrial Co.,Ltd has developed the business in the Manufacturing Decoration Materials industry for years. We have established an advanced production line and have developed based on independent production. Now we enjoy a relatively huge influence in the industry.
  • Guangdong Bunge Building Material Industrial Co.,Ltd sells movable walls from No.3, Longxi Industrial Zone, Longxi Road, Liwan District, Guangzhou, China guangzhou guangdong to various provinces and cities in China. We obtain a certain position in the market.
Company Advantages
1. office glass partition design possess ideal control properties due do partition wall with glass. The product finds its wide use in the banquet hall, conference room, office, etc
2. glass walls for office interiors owns advantages of glass partition wall systems. It will be safely packaged in a carton box and a wooden box
3. There is no doubt that without the high-quality customer service, Bunge could not have been so popular in this market. The product helps to create a multi-purpose room for multiple uses

83 mm Type Aluminum Alloy Anodized Glass and Full Panel Solid Partition Walls

Aluminum Glass Partitions Deatils


 

  • Product name: Aluminum glass partitions

  • Model Number: BG83mm glass partitions

  • Brand Name: BUNGE

  • Place of Origin: Guangzhou,China

  • Dimension(mm): Aluminum alloy partition Walls Customized

  • Materials: 

  1. Frame: Aluminum alloy profile

  2. Panel: Single glass, Double Glass, MFC

  • Color:

  1. Aluminum Frame: Oxidation

  2. Glass: Clear class,frosted glass

  3. MFC: 14 colors are available

  • Unit Volume(CBM): Please contact us for more details

  • MOQ: No MOQ

  • Appearance Style: Modern office funiture

  • Packaging: Knock Down Packing(CKD)

  • Packing Materials: Compressed and packed by carton. According to clients' request


Bunge-High-quality Partition Wall With Glass And Frameless Glass Wall

Technical Information


Application


Materials

Aluminum alloy 6063 T5 /T6  or 6061 T4/T6 or as customers' need

Surface

Powder.coated,PVDcoating,anodized,electrophoresis,with various colors

Profile shape

in accordance with drawing or re-design as requested or market needs.

Detailed Product Description

 

1.Excellent waterproof and thermal break 
2. Good sound insulation 
3. Good air tightness 
4. Environmental-protection

Packing

Packing: inner plastic film, outer kraft paper or as customers' demand

Payment term

T/T 40% deposit and balance brfore delivery

Brand

BUNGE

Certificate

ISO9001 ISO14001

Aluminium product

Aluminum profile of windows & doors frame,thermal-break aluminum profile, curtain wall, sliding window & door, casement window & door,

industrial aluminum extrusion,heat sink, aluminum pipe, aluminium tube, U profile, 

T profile, etc.

Warranty

1. GB5237-2008 equal to EN12020-1.2(2001); 2. Within 15 years without colour changing, all life without surface peeling off; 3. All life withour dfformation without outer force

Moulding

1. Using our moulds, no fee; 2. Using customer drawing, opening mould, usually about 10 tons the moulding fee is free; 3. Can be diguessed.

Bunge-High-quality Partition Wall With Glass And Frameless Glass Wall-1

Aluminum Glass Partitions Advantages

1.Double or single layers aluminum glass partitions, easy disassembly, low construction sound, reusable when refurbishing the environment benefits.


2.Super Wire Installation Function to meet the systematical needs of any working places.


3.Solid glass partition can be customized to 3 layers according to different sound-insulation needs. 


4.Adapt to kinds of thickness of aluminum glass partitions to provide the best cost performance.


5. Fine structural design, allow glasses to be assembled and disassembled separately ,easy installation.   


6. Profile material use 6063-T5 Aluminum Alloy of which the performance is superior than industrial Aluminum Alloy, it has good hardness and corrosion tolerance, Aluminum alloy frame, durable and stable construction.


7. Special sealing aluminum design offers adjustable function of the aluminum glass partition.


8. The aluminum bar design between the connection of the double glass produces effect sound insulation.


Bunge-High-quality Partition Wall With Glass And Frameless Glass Wall-2


Aluminum Glass Partitions Benefit

1. A certain degree of privacy is achieved.


2. Can reduce the level of communication between staff. 


3. Completely see-through, let in light and display who is in the room.


4. Fixed glass partitions panels provide a very modern and contemporary look, just choose different color of glass or different photos and word on the fixed glass partitions panel.


5. Provide stability and offer a preventative measure to deal with acoustic and visual distractions.


6. Can provide a much better solution than the alternatives, such as permanent study walls or temporary screens.


7. A wise choice to divide up the floor space in an office.


8. Specialized plastic injection channel is set up at angle joint to ensure that the internal and back of the angle joint is sealed effectively, and strengthen the angle.


9. Internal and external continuous glass sealing strip can seal better. 


10. Special angle steel sheet enhances the angle quality of the hanging arm of the frame and fan angle. 

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...