Home  >  APPLICATION Factory  >  Banquet Hall Partitions Manufacturing  > 

partition proofing partition door design aluminium Bunge Brand company

partition proofing partition door design aluminium Bunge Brand company

Partition proofing partition door design aluminium Bunge Brand company

Model
100 mm folding wall partitions
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding wall partitions
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Plywood,MDF bare finish,melamine
Application: Exhibition,classroom,office
Color: Multi color
Style: Sliding and folding
Application Scope
Bunge Building Decoration Engineering's folding partition has been widely used in many industries. Bunge Building Decoration Engineering always adheres to the service concept to meet customers' needs. We are committed to providing customers with one-stop solutions that are timely, efficient and economical.With a focus on product quality, Bunge Building Decoration Engineering firmly believes that details create quality products. We insist on controlling the quality from details. We strictly monitor all aspects of the production and screen out unqualified inferior products. All this guarantees movable walls are formaldehyde-free, pollution-free, safe, eco-friendly and durable.
  • Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration
Enterprise Strength
  • Bunge Building Decoration Engineering has a group of high-quality and high-efficiency technical talents. They have rich industry experience and exquisite production technology. They provide strong support for efficient business operation.
  • Bunge Building Decoration Engineering provides quality products, good technical support and sound after-sales services for customers.
  • Bunge Building Decoration Engineering will as always, follow the business philosophy of 'brand is the root, innovation is the soul'. And we adhere to the enterprise spirit of 'seek the truth, cooperate together, move forward'. We constantly improve technology and optimize management. We are committed to providing consumers with more quality products and comprehensive services.
  • Bunge Building Decoration Engineering first came into the market in 2009. After years of exploration and innovation, we run a brand new production model of movable walls and become an example in the industry.
  • In recent years, Bunge Building Decoration Engineering runs a relatively complete sales system and actively explores new sales markets, which leads to the annual increment of domestic market share.
Company Advantages
1. The manufacturing of Bunge operable glass wall is carried out by a professional team. The product ensures a safe user experience
2. The applications of portable walls with doors technology in manufacturing process can acoustic room dividers partitions. Tracks of the product are made of high-quality anodized aluminum 6063-T5
3. The product, with so many competitive edges, finds a broad range of applications. Every corner and edge of the product are carefully processed
4. The demand of the product is increasing and the market prospect of the product is promising. It adopts the convenient hanging system without the floor track


Ballroom Acoustic Movable Walls Sliding Folding Wall Partitions

Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-1

Description


Folding wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Sliding partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-2Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-3Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Folding wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-5Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-6

Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-8Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-9

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-10

Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-11Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-13


Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-14Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-15

Bunge-Find Hall Partition Designs Moveable Partitions From Bunge Building Decoration-16



Company Features
1. Bunge is more and more popular in partition door design industry.
2. Based on the application of leading technology, temporary partition wall has made great achievement in its finest quality.
3. Guangzhou Bunge Building Decoration Engineering Co., Ltd will always adhere to the soul of 'practical, effective, and pioneering'. Get an offer!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...