Operable Wooden Soundproof Folding Hotel Partition Walls Malaysia
BUNGE FACTORY OFFER YOU
1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.
FACTORY DIRECT PRICE--NICE QUALITY--NICE SERVICE--QUICK SHIPPING.
65 mm hotel partition walls ONLY FOR $85.
85 mm hotel partition walls ONLY FOR $98.
100 mm hotel partition walls ONLY FOR $118.
125 ultra-high system hotel partition walls ONLY FOR $130.
Please contact us for the Detailed Price.
WhatsApp:008613928983277
Series | BG65 | BG85 | BG100 |
Panel suspension | Top hung only | Top hung only | Top hung only |
Panel thickness | 65mm | 85mm | 100mm |
Max height | 4000mm | 6000mm | 18000mm |
Panel width | 500-1200 mm | 500-1200 mm | 500-1200 mm |
Face material | 9mm | 9mm | 12 mm |
Passdoors | Single door or Double door | ||
Sound insulation | 28-38dB Rw | 28-42dB Rw | 32-50dB Rw |
Finish Material | Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.(Customized) |
Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the hotel partition walls with wheels.
Wheels/Rollers: It is the carrier for the hotel partition walls ,let panels move more flexibly.Pulley bearing is more than 1600 KGS.
Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.
Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.
Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.
Handle: Operate the retractable being up and down.
Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.
Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the hotel partition walls.
MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.
As you know, when we do not use the hotel partition walls, we can park them to the parking area. Actually there are many parking styles for the hotel partition walls, all of the clients can choose the suitable one and we can adjust based on their own project site. If you need some pocket doors to hide the panels, BUNGE Factory also can produce for you.
❶ Wooden (MDF, Plywood bare raw finish) (Melamine, Veneer)
❷ Fabric (fabric with mdf board hard covers) (fabric with sponge soft covers)
❸ Leather (leather with mdf hard covers) (leather with sponge soft covers)
❹ Wallpaper, Vinyl, Fireproof board
❺ Acoustic panels
❻ Tempered glass, mirror etc.
1.Buy 30 square meters Get 5% Discount.
2.Buy 80 square meters Get 10% Discount.
3.Get a FREE SAMPLE.
4.Support a 3 YEARS WARRANTY.
5.To be general, BUNGE Factory has 10+ years experience in the line of hotel partition walls. The operable partitions we produced can divide the space speedy and conveniently. Due to their flexibility and cost effectiveness, now more and more clients need them to divide a large room. Also the hotel operable partition walls are widely used in office buildings, meeting room, hotel, banquet hall, conference and function halls, church, classroom and so on. Would you like to get a free design? Welcome to contact us at any time.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.