Home  >  Quality PRODUCTS For sell  >  Best Movable Walls Factory  >  Hot Folding Partitions Company  > 

operable movable office walls supplier for banquet hall EBUNGE

operable movable office walls supplier for banquet hall EBUNGE

operable movable office walls supplier for banquet hall EBUNGE

Model
85 mm folding partition walls
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes.
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Folding partition walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Conference room,hotel,banquet hall and etc
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendlyDivide space
Size: 2440*133 mm, 2440*197 mmThickness 83 mm
Color: Multi color
Style: Sliding
Company Advantages
1. EBUNGE movable office walls with unique design delivers preferable attractions. Defects will not be founded in the product after it is strictly inspected
2. The product provides a perfect balance of form and function – a great aesthetic appeal that combines the building's architectural style together with the style of furniture in the building, resulting in a practical design that gives the building a modern look. It adopts the high-performance MDF board and rockwool panel
3. The application of movable office walls is more and more popular because it has features like removable wall dividers . The product finds its wide use in the banquet hall, conference room, office, etc
4. movable office walls enjoy the advantages of removable wall dividers . It can be used to save the power consumption of the air conditioning
5. Fact says movable office walls is removable wall dividers , it also possesses merits of movable partition doors . The product greatly highlights its easy installation


Retractable Acoustic Folding Partition Walls for Conference Room

Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-1

Description


Folding wall partition is a kind of movable wall that can divide a large space into a small space. It can serve as a multi-purpose room with multiple functions.


Top hanging system without floor track. Also is seal and has good sound insulation.

 

Our factory can provide four series product let you have a choosing. Panel height is from finished floor to ceiling or beam. Panel width is from wall to wall.


Restaurant partition wall usually use in banquet hall,conference room,classroom,office and etc.


Our main structure that is aluminium frame with mdf board, inside soundproof rock wool and aluminium keen.


Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-2Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-3Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-4
Technical information


SeriesBG 65BG 85 BG 100
Panel SuspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness 65 mm85 mm100 mm
Max height4 m6 m15 m
Panel width600-1200 mm600-1200 mm600-1200 mm
Face material9 mm MDF Board9 mm MDF Board9 mm MDF Board
Retractable sealsAluminium black with double rubber sealsAluminium black with double rubber sealsAluminium black with double rubber seals
Operation of sealsManual,with crank handleManual,with crank handleManual,with crank handle
Sound insulation20-35dB30-45dB35-53dB
Surface


Folding wall partition has three kinds surface.


First is mdf melamine,it can be more easy to clean.


Second is leather or fabric with hard cover inside aluminium frame.


Third is leather or fabric with hard cover hidden aluminium frame.


Fourth is mdf bare finish,client can paint prefer color on mdf board in local city.


Also has plywood finish,customers can paste wallpaper on it.


If client prefer to veneer surfrace,we should know whether needs paint color,and whether needs other extra surfrace.


If client prefer to use mirror  surface,mirror thickness is 5 mm,basic board is 5 mm.

Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-5Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-6

Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-7

Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.


Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.


Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.


Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.


Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.


Handle: Operate the retractable being up and down.


Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.


Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.


MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-8Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-9

Folding partition wall advantage

No rail suspension:the floor has no track, just install the track on the ceiling.


Stable and safe:Stable and reliable after partitioning, not easy to swing.


Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.


Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.


Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,

the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.


Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.


Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.


Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-10

Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-11Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-12

Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 65,more than 80 square meters, free sample.


   Series 85,quantity up to 120 square meters, extra 20 rollers.


   Sereis 100, more than 200 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-13

Packing & shipping


Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels. 


And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.


We usually transport movable panels by sea, such as CIF price.


Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.


Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-14Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-15

Bunge-High-quality Folding Partition Walls | Retractable Acoustic Folding-16



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has introduced many advanced machines used in the production of movable office walls .
2. To establish the service philosophy of removable wall dividers is the base of Guangdong Bunge Building Material Industrial Co.,Ltd's work. Inquire now!
Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...