EBUNGE  > 

AI - Page Sitemap

 > 

office table furniture for conference room EBUNGE

office table furniture for conference room EBUNGE

Office table furniture for conference room EBUNGE

Model
BG Office Partitions
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
12-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper carton
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office Partitions
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminum and board
Finish: Melamine,veneer,metal
Application: Office,conference room,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Office Work,office partitions,office dividers,office standing
Size: Accept customized
Color: Can be customized
Style: Modern
Company Advantages
1. office table furniture is more applicable to purchase office furniture with its features of office furniture cabinet . The surface of the product can be arbitrarily decorated by customers
2. The product is priced low and has a broad market application prospect. It adopts the convenient hanging system without the floor track
3. The product features a humanized design. It is equipped with an automatic valve, which means that the filter can be automatically rinsed and back washed according to the running time and the water flow rate. It can divide a large space into small spaces for effective space utilization
4. The product does not easily tarnish. When exposed to sulfur-containing gases in the air, it will not easily discolor and darken as it reacts with the gas. It displays a gorgeous and delicate appearance

Water Proof Standard Office Furniture Partitions Table With Drawers Two - Six Office Desk Dividers

Office Partition Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

office table furniture for conference room EBUNGE-1


Technical Information
ItemFactory direct sell office furniture oem modular office furniture
Item NOBUNGE Office partition walls
NameOffice workstation, office partition,office cubicle
ShapeOptional/based on clients‘ requirement
PackagingFilm+foam+carton+wooden frame (4 layers protection)
Size1200W*600D*1050H and optional
Desk top MaterialTop grade E1 MFC melamine board
Partition MaterialAluminum /tempered glass
Desktop Seal edgePVC/ABS
Products CharacterEco-friendly,Anti-Water, Anti-Scratch, Anti-Dirty
Model No.BUNGE Office Workstations
MaterialE1 Level High Density Board/Melamine/Aluminum
Size1500*500*750/seater
CBM0.5 cbm/5 PC
Net Weight75 KG
QTY/40HQ180 pieces
Steel Thickness1.5MM thickness tube
ColorMore than 20 colors can be optional.
PackingStandard carton with foam corner
Advantages* Thousands of models for choice to meet different client's demands;
Different styles with different price range, can control cost with best way;
* Customized service, OEM, ODM available

office table furniture for conference room EBUNGE-2

Office Partitions Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office partition walls should be tested before delivering out producing workshop.

office table furniture for conference room EBUNGE-3


Office Partitions Finishing

There are 3 kinds of finishes to choose:

office table furniture for conference room EBUNGE-4


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

office table furniture for conference room EBUNGE-5


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

office table furniture for conference room EBUNGE-6



Company Features
1. We have cultivated a professional sales team. They have good communication skills and coordination capabilities. These features enable them to precisely identify customers needs, so as to provide target products.
2. With the advanced and innovative technology of Bunge Partitions, it has or will have a far-reaching impact. Call now!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...