Home  > PRODUCTS  >  Office Partition Workstation Wooden White Office Modern Front Reception Desk
Office Partition Workstation Wooden White Office Modern Front Reception Desk

Office Partition Workstation Wooden White Office Modern Front Reception Desk

Model
Office reception desk
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
50 pieces per month
MOQ
No MOQ
Packing Details
Wooden box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office reception desk
Feature: Fine Workmanship
Application: Office, conference room and etc
General use: Office furniture
Material: Painting glass, mfc panel,
Function: Attract Customer
Size: W2400*D616*H1050 mm
Color: Can be customized
Style: Modern style

Office Partition Workstation Wooden White Office Modern Front Reception Desk

 

Description

Office reception desk main material is made of melamine laminated Particle board or MDF or MDF with veneer and painting.It has the character of anti-water, anti-dirty, anti-scratch.

 

Special character of our office reception table: All the edges sealed with high quality PVC or Painting, the glue used for the lamination which is imported from Germany, friendly for the environment. All the hardware parts are good quality, strong and durable. Aluminum frame glass door with high grade lock and hinges, bring you comfortable work environment.

 

 

office reception desk (13).png

 

 

office reception desk (14).png

Techincal Information


Products  Name

Reception table ,bank counter, reception desk,office furniture

Style 

Rectangle ,square 

Specific Use

Office Furniture ,Home Furniture ,Hotel Furniture 

Material 

Melamine Laminated Flake board or  MDF (which have the character anti-water ,
anti-dirty ,anti-scratch , easy to clean and keep fresh color) .

Table Size 

2400*616*1050mm,customer OEM size welcome 

Packing Details

Knock Down Packing , each parts of the products packed by double strong carton boxes , 
inside with the pear cotton protection ,with instruction manual easy to assemble .

Packing Volume

0.23- 0.40 CBM 

Gross Weight 

85-148.0KG

 

 

office reception desk.jpg

 

2.jpg

Feature


Office reception desk function &feature:

 

1. Good quality with competitive price.


2. Modern, Comfortable , Elegant and endurable, Environmentally-friendly materials.


3. The best after-sales service, Mutual Development, Mutual Benefits, so make long time cooperation.


4. Thousands of models for choice , fully meet different customers' demands.


5. Different styles with different material and price range, control cost in the best way.


6. Customized service: OEM, ODM available.



Packing


Knock down packing, each part is packed with PE Foam, inside for protection, outside with double strong 5 layers carton boxes, Carton boxes print with the customers Logo and description, inside instruction manual easy for assemble; With Glass parts are packed by wooden frame to to avoid fragile.

 

office workstation packing

We can offer


1. High quality at cost effective price.


2. Custom design and manufacturing according to your CAD drawing.


3. One-step full package office furniture solution:


Executive desk, cabinet, chairs, conference table, sofa, reception table, work station, etc.


4. Warranty is about 5-10 years to supply service.

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...