product-EBUNGE-img
Home  > PRODUCTS  > 

Office Furniture Desk Modern Design Children Study Fabric Stackable Plastic Office Chair

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Office Furniture Desk Modern Design Children Study Fabric Stackable Plastic Office Ch
product-Office Furniture Desk Modern Design Children Study Fabric Stackable Plastic Office Chair-EBU-1
product-EBUNGE-img-1

Office Furniture Desk Modern Design Children Study Fabric Stackable Plastic Office Chair

Model
Office stackable chair
Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 pieces per month
MOQ
No MOQ
Packing Details
Inner PE foam ,Paper Cartons
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office stackable chair
Feature: Office Sitting Chairs
Finish: Fabric, pu leather, mesh
Application: Office, conference room and etc
General use: Office furniture
Material: PP material
Function: Office Sitting Chairs
Size: 480*470*790 mm
Color: Can be customized
Style: Modern style

Office Furniture Desk Modern Design Children Study Fabric Stackable Plastic Office Chair

Description

1.Stackable office chair metal frame can bearing above 200kgs.

 

2.Stackable design can save space and freight for you.

 

3.You cam select color as you like,customer's design can be accepted.

 

4.We can provide 5 years guarantee and after-sale service.

 

5. 1.5mm chrome frame.

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products

Techincal Information

 

Product NameStackable plastic chair for sale 
Brand NameSteel art
Item No.SA-FT-007
SizeW480*D470*H790 mm
Material1. Back: polypropylene PP plastic
2. Seat: polypropylene PP plastic
3. chrome metal feet
ColorMulti color
UsageOffice, training room,conference room,school
OEM/ODMAccepted
Mixed orderAccepted

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-1

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-2

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-3

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-4

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-5


Feature


Office stackable chair function &feature:

 

1.PP back with curved streamlined design offers support for your lumbar.

2.Large load capacity.

3.Steel base for greater stability.

4.Fabric seat makes you comfortable.

5.Durable, beautiful and professional design.


EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-6

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-7

Office stackable chair advantage:

1.Ergonomic , Convenience , Fashion , Modern design.

2.Competitive price of high quality chair.

3.The back of the chair is made of high-quality materials and is designed to be ergonomic.

4.Steel tube chair frame, steel plate plating treatment, metal texture, beautiful appearance.

Application


EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-8

EBUNGE-Custom Movable Partition Manufacturer, Style Movable Partitions | Products-9

Packing


EBUNGE-Oem Movable Partition Price List | Bunge Partitions-8

We can offer


More than 100 pieces folding office chair, discount 30 USD for free.

 

Quantity about 100-150 pieces, 5 office chair for free.

 

Office workstation,foldable table purchase together, folding office chair 29 USD per piece.



Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...