Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels-movable wall, folding partition,operalbe wall-EBUNGE
Home  > PRODUCTS  > Office Furniture  > 

Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels

movable wall- folding partition-operalbe wall-EBUNGE
EBUNGE
movable wall- folding partition-operalbe wall-EBUNGE
EBUNGE-Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels
Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels-EBUNGE
EBUNGE
EBUNGE-Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels

Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels

Model
BG Conference Tables
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 sets
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
OEM/ODM
Accept
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Contemporary conference tables
Feature: Eco-friendly
Finish: Melamine,veneer
Application: Conference room,office,meeting room
General use: Office furniture
Material: MFC Board
Function: Office Work,office partitions,office dividers,office standing
Size: 2400*1200*750 mm, accept customized.
Color: Can be customized
Style: Modern

Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels

Technical Information

Name

Office Furniture Adjustable Contemporary Conference Tables Chairs with Wheels

Keywords

Conference tabels,office furniture,office chairs with wheels

General Use

Commercial Furniture ; Office Furniture

Material

Top grade MFC,

Eco-friendly painting fine finishing, 

High quality hardware accessories, 

Genuine leather or PU

Color

 As per the picture, can be customized

Size

2400W*1100D*750H

8000W*2200D*760H

Or customization is acceptable

Components

Description

 

 1. Table Top:wire grommet design included;genuine leather or soft PU work area;

 2. Front panel;ISO9001 and ISO14001 and other International Standards

 3. Pedestal;

 4. Design: Modern

 5. Color: Walnut,Mahogany,etc.

 6. Certificate:ISO9001 and ISO14001

 7. Quality Guarantee: >10 Years

8. MOQ: 1 set or more

 9.Experienced and successful high end project case local US

Bunge-Manufacturer Of Office Table Furniture Office Furniture Adjustable Contemporary

Office Workstations Advantages

1.   The surface paper is placed on the top layer of the decorative board to protect the layout, hard, wear-resistant, waterproof and fireproof.

2.   Conference tables adopts all solid wood mechanical crushing, through hot pressing technology, one-time forming, strong and durable.

3.   Apply the glue to the end face of the material through the edge banding machine to carry out the bonding. The main function is to seal the end face of the plate to avoid damage to the plate by the unfavorable factors in the environment and the use process, and to prevent the formaldehyde in the plate from volatilizing at the same time. Reach the decorative effect.

4.   Our conference table board is high density board,has a stable structure,smooth finishing,superior healthy environmental protection and other features.

Bunge-Manufacturer Of Office Table Furniture Office Furniture Adjustable Contemporary-1

Bunge-Manufacturer Of Office Table Furniture Office Furniture Adjustable Contemporary-2

Why Chose Us
1.We are OEM. Our products are factory direct sell. We can give the lowest price.
2.We have high quality. Show by the pics.
3.Our products are patented products. 
4.Our equipments are full-automation.
5.We can give a best service.
6.All of our products passed by ISO9001


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.                                                                       

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...