Office Aluminum Frame Sliding Glass Partition Walls-EBUNGE
Home  > PRODUCTS  > Glass Partitions  > Movable Glass Partitions  > 

Office Aluminum Frame Sliding Glass Partition Walls

EBUNGE-Office Aluminum Frame Sliding Glass Partition Walls
EBUNGE-Office Aluminum Frame Sliding Glass Partition Walls
EBUNGE
EBUNGE
Office Aluminum Frame Sliding Glass Partition Walls-movable wall, folding partition,operalbe wall-EBUNGE
EBUNGE

Office Aluminum Frame Sliding Glass Partition Walls

Model
85 mm aluminum partitions
Brand Name
BUNGE
Year of Establishment
2011
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton package,outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable walls
Feature: Sound proofing
Aluminium frame thickness: 2 - 15 meters
Partition material: 800 - 1200 mm
Finish: Melamine,fabric,leather
Application: Hotel,banquet hall,conference hall,etc.
General use: Office furniture
Material: 100% Polyester Fiber
Function: Fireproof and eco-friendly
Size: 9mm*1220mm*2440mm
Color: Can be customized
Style: Sliding


Office Aluminum Frame Sliding Glass Partition Walls


Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS.
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.



Product Description



Office Aluminum Frame Sliding Glass Partition Walls



Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-1



Features of BUNGE Aluminum Partitions System

  •   Easy element adjustment after installation.

  •    Track system shall be extruded aluminium, maintenance free with heavy-duty ball bearing steel rollers,wearing resistant.

  •     The colors of aluminum frames or tracks can be powder coated,such as black,silver and so on.

  •   There are many options about the aluminum partitions:clear glass,tinted glass,low iron glass,laminated glass and decorated frosted glass etc.

  •     The design& size& color of the aluminum partitions can be customized by customers's requirement.

  •     Provides insulation from draughts, rain & noise with a self-draining aluminum tread.


Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-2
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-3



Specifications of BUNGE Aluminum Partitions System




BG65 Glazing Glass PartitionBG85 Aluminum Frame Glass PartitionBG85 Sound proof Glass Partition
Panel suspensionTop hung onlyTop hung onlyTop hung only
Track systemSingle or twin pointSingle or twin pointSingle or twin point
Panel thickness65mm85mm85mm
Panel heightUp to 3000mmUp to 6000mmUp to 6000mm
Max height3000mm6000mm6000mm
Panel width800-1100mm800-1100mm800-1100mm
Frame constructionTop and bottom aluminumAluminum frameAluminum frame
Glass thickness10mm single glass10mm or 12mm single glassdouble 10mm glass



Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-4



Aluminum Components of Retractable Partitions System


Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.

Wheels/Rollers:  It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.

Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.

Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.

Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.

Handle: Operate the retractable being up and down.

Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.

Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.

MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.


Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-5
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-6
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-7



Stacking Options of BUNGE Aluminum Partitions System



Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-8
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-9
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-10




Finishes Options of BUNGE Aluminum Partitions System


  •    Wooden (MDF, Plywood bare raw finish)    (Melamine, Veneer)

  •    Fabric (fabric with mdf board hard covers)    (fabric with sponge soft covers)

  •   Leather (leather with mdf hard covers)    (leather with sponge soft covers)

  •   Wallpaper, Vinyl, Fireproof board

  •    Acoustic panels

  • ❻   Tempered glass. etc.

Externally, most Aluminum Partitions System panels look the same, but it’s not simply the outside which makes a good movable wall, it is what’s inside the panel which makes the difference.


Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-11
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-12
Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-13



Common Applications of Aluminum Partitions System



Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-14


The aluminum partitions are suitable for large-scale conference room, banquet halls, exhibition halls, office, multi-purpose hall and other professional venues. Various types of glass partitions can be turned at any angle to achieve a full range of multi-angle flexible separation space, fully demonstrating the separation art of indoor space


Bunge-Professional Glass Wall Doors Interior Glass Partitions Supplier-15


Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...