Home  >  Quality PRODUCTS For sell  >  Certificated Acoustic Panels Factory  >  Top Grooved Wooden Acoustic Panels Company  > 

music acoustic soundproofing acoustic panel material Bunge Brand

music acoustic soundproofing acoustic panel material Bunge Brand

music acoustic soundproofing acoustic panel material Bunge Brand
  • music acoustic soundproofing acoustic panel material Bunge Brand
  • music acoustic soundproofing acoustic panel material Bunge Brand
  • music acoustic soundproofing acoustic panel material Bunge Brand
  • music acoustic soundproofing acoustic panel material Bunge Brand
  • music acoustic soundproofing acoustic panel material Bunge Brand
  • music acoustic soundproofing acoustic panel material Bunge Brand

music acoustic soundproofing acoustic panel material Bunge Brand

Model
BG grooved wall panels
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
50000 square meters
MOQ
No MOQ
Packing Details
Paper carton
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Wooden grooved acoustic panels
Feature: Sound proofing
Finish: Melamine,veneer
Application: Hotel,banquet hall,conference hall,etc.
General use: Sound proofing materials
Material: MDF
Function: Fireproof and eco-friendly
Size: 2440*133 mm, 2440*197 mm
Color: Can be customized
Style: Modern
Application Scope
As one of Guangdong Bunge Building Material Industrial Co.,Ltd's main products, movable walls has wide applications. It is mainly used in the following aspects.With a focus on customers' potential needs, Guangdong Bunge Building Material Industrial Co.,Ltd has the ability to provide one-stop solutions.Guangdong Bunge Building Material Industrial Co.,Ltd's movable walls are made of safe, eco-friendly and wear-resistant and durable materials. They won't cause pollution to the environment. They feature fashionable design, excellent performance, long service life, easy cleaning and installation. They are unanimously praised and trusted in the industry.
  • Bunge-Professional Acoustic Wood Panels Soundboard Panels Manufacture
Company Advantages
1. sound absorbing panels's internal structure endows it with well performance such as acoustic panel material. The product is found to have good sound insulation
2. office soundproofing panels is such characteristics of soundproof wall panels produced by Guangdong Bunge Building Material Industrial Co.,Ltd. Equipped with a sealing device, the product is praised for its tight sealing performance
3. According to the customer's order requirements, Guangdong Bunge Building Material Industrial Co.,Ltd can accurately and timely complete the production tasks with quality and quantity. The surface of the product can be arbitrarily decorated by customers

Sound Proof Materials Absorbing Wall Boards Grooved Acoustic Wall Panels Manufacturer

Grooved Wall Panels Performance


Absorption is usually defined in terms of an absorption coefficient(usually denoted by the Greek letter alpha, α), defined as the ratio of absorbed to incident sound energy from a single interaction between a sound wave and a certain material. Absorption coefficients range from 0 to 1 and vary with frequency, α=0 means that the material absorbs no sound and reflects all sound energy incident on it. α=1 means that the material absorbs all sound energy incident on it and reflects none.

 

Absorption coefficients of 0 and 1 are ideal values that do not exist in reality because all materials reflect and absorb some sound. In general, materials having absorption coefficients less than 0.15 are considered to be reflective and those having absorption coefficients greater than 0.4 are considered to be absorptive.


As you can see our Testing report show that our products have a very good performance in a large range of application.


 

Bunge-Sound Dampening Panels Sound Proof Materials Absorbing Wall Boards Grooved

Technical Information
Model type28/4,30/2,29/3,14/2,13/3,59/5,5/3,40/3
Size133*2440 mm
Thickness12,15,18mm
FinishMelamine,veneer
PaintUV,PU painting
Base materialStandard MDF, Eco-pine wood MDF, Fireproof MDF, Moistureproof MDF, Magnesium Composited MDF
MDF density680kg/cubic meter~830kg/cubic meter
Backside finishFiber proof acoustic fabric
Fireproof gradeGB8624 2006 B,A
Eco-protection gradeE0,E1
InstallationAluminum keel and clips, wood frame, gun nail
Backside hole diameter10 mm
Interval2~4mm
Veneer type thickness0.3,0.6mm
Veneer textureMountain texture, straight line
Veneer tree species

Maple,cherry,Oak, teak,walnut, Sapele,beech,birch,

Chinese walnut,macore,sandalwood

CertificationISO9001-2008,
Test reportEco protction, sound absorption, flame retardant

Bunge-Sound Dampening Panels Sound Proof Materials Absorbing Wall Boards Grooved-1

Wooden Grooved Acoustic Panels Applications

1. Professional space for timbre effect and decoration: Studio, recording room, listening room, rehearsal hall etc.

 

2. Recreational place for sound effect and decoration:Theater,cinema,indoor gymnasium, disco,KTV etc.

 

3. Sound-absorbing place for secret or privacy and decoration:Meeting room, office,hall and hotel etc.

 

4. Noisy industry for health and environmental protection:Airport,railway, bus station,factory and workshop etc.


Bunge-Sound Dampening Panels Sound Proof Materials Absorbing Wall Boards Grooved-2

Grooved Wall Panels Finishes

BUNGE wooden grooved acoustic wall panels are available in three main finishes, Wood Veneer, High quality paint finish, and decorative Laminate. This gives the designer almost an unlimited choice in designing the wall or ceiling finish. The grooved acoustic wall panels range includes standard wood veneers chosen from the most popular colours available, as is the same with the High quality decorative laminates.

 

REAL WOOD VENEER

 

The standard range of wood veneers is available on an exstock basis, however Tengfei can choose from international suppliers quality veneers to match your choice

 

Paint Finish

 

BUNGE wooden grooved acoustic panels are available in either Pantone or RAL colours. This gives almost an unlimited choice in selection. The paint finish is in a high quality 2pac finish and can be supplied in Gloss, Matt or Satin finishes.


Bunge-Sound Dampening Panels Sound Proof Materials Absorbing Wall Boards Grooved-3


Installation Methods

A)Preparation


1.The place of installation must be dry,with the lowest temperature no less than 10 degrees celsius.


2.the acoustic panels to be installed must be placed in the place of installation for at least 48h in  order to adapt the indoor environment.


3.After installation ,the largest humidity changing rate of the place of installation should be between 40%-60%.


4.The distance between each wood keel must be less than 500mm and that between each light steel keel should no more than 600mm.


B)Installation


1.Confirm the place of installation ,determine the horizontal and vertical lines and the reserved measurements for the electric wire socket ,pipes.etc.


2.Calculate the actual construction measurements and cut the part of acoustic panels if needed.


3.Start to install and follow the rules:from left to right,from bottom too top.for horizontally installation.make the grooves up;for the vertical installation,make the tougues on the right.for real wood veneer acoustic panels that have requirements on the direction of the stripes,the panels should be installed according to the pre-marked sequence numbers.


C)Installation system


1.Lightweight steel keel system


2.Wooden batten system


Bunge-Sound Dampening Panels Sound Proof Materials Absorbing Wall Boards Grooved-4


                                   Melamine ,natural wood veneer,paint,etc                                    


Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has developed many sound absorbing panels varieties with top expertise in the field.
2. Bunge has intellectually great technical power to produce soundproof wall panels with finest quality.
3. To serve customers better, Bunge has established its own service team. Inquiry!

                                   Melamine ,natural wood veneer,paint,etc                                    

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...