Movable Soundproof Acoustic Modular Office Workstation Folding Wall Partition
Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.
Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.
Series | BG 65 | BG 85 | BG 100 |
Panel Suspension | Top hung only | Top hung only | Top hung only |
Track system | Single or twin point | Single or twin point | Single or twin point |
Panel thickness | 65 mm | 85 mm | 100 mm |
Max height | 4 m | 6 m | 15 m |
Panel width | 600-1200 mm | 600-1200 mm | 600-1200 mm |
Face material | 9 mm MDF Board | 9 mm MDF Board | 9 mm MDF Board |
Retractable seals | Aluminium black with double rubber seals | Aluminium black with double rubber seals | Aluminium black with double rubber seals |
Operation of seals | Manual,with crank handle | Manual,with crank handle | Manual,with crank handle |
Sound insulation | 20-35dB | 30-45dB | 35-53dB |
Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.
Tracks: Made of good quality anodized aluminium 6063-T5 materials,hanging the retractable partitions panels with wheels.
Wheels/Rollers: It is the carrier for the retractable partitions,let the panels move more flexibly.Pulley bearing is more than 1600 KGS.
Connectors: Made of anodized aluminium 6063-T5 aluminum tracks,“L”, “T”, “+”types are available.
Rubber/vinyl seal: Made of Nitrile Butadiene Rubber(NBR+PVC),durable and perfect for sound insulation,wear-resistant.
Rock Wool: Density of 60kg/m3,help us reduce the noise and heat.
Handle: Operate the retractable being up and down.
Retractable mechanism: Control the movement of the top and bottom seal to form a excellent sound insulation performance.
Magnetic Strip: Ferrite plastic magnetic material will be used in between aluminum profiles to enhance acoustic performance of the retractable partitions.
MDF board: 9 mm thickness,density of 760kg/m3,absorbent thickness expansion rate is less than 15%.Formaldehyde emission is 34mg/100g.
No rail suspension:the floor has no track, just install the track on the ceiling.
Stable and safe:Stable and reliable after partitioning, not easy to swing.
Retractable acoustic seals at top and bottom, operated either by quick release handle or semi-automatically with electronic controls.
Sound insulation and environmental protection:sound insulation effect is good,the sound insulation coefficient can reach 53 dB.
Insulation and energy saving: Excellent thermal insulation performance,according to different occupancy rates,
the sound proof partitions can divide a large space into small spaces to reduce air conditioning power consumption.
Efficient fire prevention: Sound proof partitions are made of high-efficiency fireproof material and has good fireproof performance.
Retractable and flexible:the sound proof partitions are freely retractable and flexible, and one person can complete the whole process of partitioning.
1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.
2.Price--Because we are factory,so we can provide nice quality and lower price products.
Series 65,more than 80 square meters, free sample.
Series 85,quantity up to 120 square meters, extra 20 rollers.
Sereis 100, more than 200 square meters, discount 300 USD. AND FREE OFFICE CHAIR
3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.
4.Team--We have our own engineering department, according to your request for your tailor-made for your product.
5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.
Folding partition wall when we finished production, we will use carton packing and mdf board to pack movable panels.
And we will also make one or more packing boxes for clients.It can reduce damagement during transportation.
We usually transport movable panels by sea, such as CIF price.
Some aluminium profile,sliding track,glass clips and other accessories we can transport by courier, like DHL or Fedx.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.