Home  > PRODUCTS  > Movable Walls  > 

Movable partition wall bearing aluminum track partition wall board interior wooden partition wall for banquet

Movable partition wall bearing aluminum track partition wall board interior wooden partition wall for banquet

Model
Movable partition wall
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days
Supply Ability
5000 square meters per month
MOQ
No MOQ
Packing Details
Carton packing, box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Movable partition wall
Feature: Divide space
Aluminium frame thickness: 85mm
Partition material: MDF board, plywood
Finish: Melamine,fabric,leather,plywood and etc
Application: Banquet hall,conference room,classrom,hotel
General use: Room dividing
Material: Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Fireproof and eco-friendlyDivide space
Size: 2440*133 mm, 2440*197 mmThickness 83 mm
Color: Can be customized
Style: Modern style

product-EBUNGE-img

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)

                                                                     

product-Movable partition wall be<p><img src=

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-1

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-1

product-EBUNGE-img-1


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-1

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-1

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-img-2

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-2

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-2


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-img-2

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-2

product-EBUNGE-img-2

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-EBUNGE-img-3

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-3

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-3


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-img-3

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-4

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-4

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-img-4

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-4


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-4

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-EBUNGE-img-4

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-5

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-5

product-EBUNGE-img-5

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-5


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-6

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-6

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-img-6

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-6

product-EBUNGE-img-6


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-6

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-7

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-7

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-7

product-EBUNGE-img-7

product-EBUNGE-img-8


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-8

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-8

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-8

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-8

product-EBUNGE-img-8


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-img-9

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-9

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-9

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-9

product-EBUNGE-img-10

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-10


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-10

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-10

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-img-10

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-10

product-EBUNGE-img-11


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-11

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-11

product-EBUNGE-img-11

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-12

product-EBUNGE-img-12

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-12


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-img-12

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-12

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-12

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-13

product-EBUNGE-img-13


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-13

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-EBUNGE-img-13

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-13

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-14

product-EBUNGE-img-14

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-14


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-14

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-14

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-img-15

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-15

product-EBUNGE-img-15


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-15

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-15

product-EBUNGE-img-15

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-16

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-16

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-16


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-img-16

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-17

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-img-17

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-17

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-17


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-17

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-EBUNGE-img-17

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-18

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-18

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-18

product-EBUNGE-img-18


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-19

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-19

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-img-19

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-19

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-19


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-img-19

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina, anti-aging, no fading and abrasion in 1years.

OEM Service

Your logo can be printed on the packaging carton.


product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-20

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-20

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.


product-Sliding folding partition in room partition board melamine movable wooden partition wall for

product-sliding folding partition in banquet-EBUNGE-img

Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:

Series

BG65

BG85

BG100

Panel suspension

Top hung only

Top hung only

Top hung only

Track system

Single or twin point

Single or twin point

Single or twin point

Panel thickness

65mm

80mm / 85mm

100mm

Panel height

Up to 4000mm

Up to 6000mm

Up to 18000mm

Max height

4000mm

6000mm

18000mm

Panel width

600-1230mm

600-1230mm

600-1230mm

Frame construction

Aluminum frame

Aluminum frame

Aluminum frame

Face material

9mm

9mm / 12mm

12mm

Fire safety

Optional Class I or O

Optional Class I or O

Optional Class I or O

Vertical profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Aluminum anodised with sealing profiles

Retractable seals

Aluminum black with 
double rubber seals

Aluminum black with double rubber seals

Aluminum black with double rubber seals

Operation of seals

Manual, with supplied 
operating handle

Manual, with supplied operating handle

Manual, with supplied operating handle

Locking

Optional lock to pass doors

Optional lock to pass doors

Optional lock to pass doors

Pass doors

Single open in panel or 
double open in two panel

Single open in panel or double open in two panel

Single open in panel or double open in two panel

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Weight

Approx 22-35kg/sq M

Approx 25-40kg/sq M

Approx30-48kg/sq M

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting, etc.  (Customized)





Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-20

product-EBUNGE-img-20

product-EBUNGE-img-21


Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.

Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.

Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.

Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame

product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-21

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-21

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-21

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-21

product-EBUNGE-img-21


Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-EBUNGE-img-22

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the express.

3-year Warranty

The acoustic room divider made of  6063-T5 alumina