product-EBUNGE-img
Home  > PRODUCTS  > Movable Walls  > Operable Partitions  > 

Movable partition wall attachment operable mobile wall accordians sliding door for banquet

product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-img
product-EBUNGE-Movable partition wall attachment operable mobile wall accordians sliding door for ba
product-Movable partition wall attachment operable mobile wall accordians sliding door for banquet-E-1
product-EBUNGE-img-1
product-EBUNGE-img-1

Movable partition wall attachment operable mobile wall accordians sliding door for banquet

Model
Operable partition wall
Brand Name
Ebunge
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
7-20 days,depending on the quantity
Supply Ability
5000squaremeterspermonth
MOQ
No MOQ
Packing Details
Cartonpacking,boxpacking
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Operable partition wall
Feature: Divide space
Aluminium frame thickness: 85mm
Partition material: Aluminum, MDF board
Finish: Melamine,fabric,leather,plywoodandetc
Application: Banquet hall,conference room,classrom,hotel
General use: Roomdividing
Material: Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Fireproof and eco-friendly Divide space
Size: 2440*133 mm, 2440*197 mm Thickness 83 mm
Color: Can be customized
Style: Modernstyle

product-EBUNGE-img

Folding partition wall can separate the space speedy and conveniently.There is top hung system without the need for a floor track.

Conference room soundproof wall partition is made from high density aluminum frame, special made rubber, excellent sound insulation cotton and finish surface, etc.

Around the panel, there is sound insulation rubber, it can help to insulate the sound entering.Soundproof movable partition wall is hanging on the aluminum track, assembled with muti direction wheels.

product-sliding folding partition in banquet-EBUNGE-img
Movable folding partition characteristics

1)Aluminium movable partition wall have interlocking

male / female trapezoidal vertical aluminium profiles,

for soundproof connection between elements.

2)To ensure aluminium movable partition wall

additional friction connection, shall be integrated

with magnetic strip.

3)Aluminium movable partition wall are easy element

adjustment after installation.

4)Aluminium movable partition wall rack system shall

be Extruded aluminium, maintenance free with

heavy-duty ball bearing steel rollers.

5)Aluminium movable partition wall surface panel shall

be of 9mm or 12mm MDF with acoustic treatment to

the required level.

Technical parameters:


Series
BG65
BG85
BG100
Panel suspension
Top hung only
Top hung only
Top hung only
Track system
Single or twin point
Single or twin point
Single or twin point
Panel thickness
65mm
80mm / 85mm
100mm
Panel height
Up to 4000mm
Up to 6000mm
Up to 18000mm
Max height
4000mm
6000mm
18000mm
Panel width
600-1230mm
600-1230mm
600-1230mm
Frame construction
Aluminum frame
Aluminum frame
Aluminum frame
Face material
9mm
9mm / 12mm
12mm
Fire safety
Optional Class I or O
Optional Class I or O
Optional Class I or O
Vertical profiles
Aluminum anodised with sealing profiles
Aluminum anodised with sealing profiles
Aluminum anodised with sealing profiles
Retractable seals
Aluminum black with 
double rubber seals
Aluminum black with double rubber seals
Aluminum black with double rubber seals
Operation of seals
Manual, with supplied 
operating handle
Manual, with supplied operating handle
Manual, with supplied operating handle
Locking
Optional lock to pass doors
Optional lock to pass doors
Optional lock to pass doors
Pass doors
Single open in panel or 
double open in two panel
Single open in panel or double open in two panel
Single open in panel or double open in two panel
Sound insulation
20-32dB Rw
28-36dB Rw
32-50dB Rw
Weight
Approx 22-35kg/sq M
Approx 25-40kg/sq M
Approx30-48kg/sq M
Finish Material
Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, Vinyl, Painting,
etc. (Customized)

Finish:


Different surface use in different areas.Our main surface is mdf melamine, it can be more easy to clean.Also fabric and leather surface is very popular in conference room or banquet hall.And like dancing room or classroom,client prefer mirror surface.Also we can design surface pu leather with printing photos.If client prefer to paint color on panels, we suggest Mdf bare finish.If prefer to glue wallpaper, plywood surface is a good choice.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-1product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-1product-EBUNGE-img-1

Production:

Manufacturer based

We are a professional comprehensive office glass partition Manufacturer in Guangzhou, China, we make sure to offer the best solutions of space flexible.

product-EBUNGE-Movable partition wall bearing aluminum track partition wall board interior wooden pa-4

Installation:

Movable partition wall is composed of many single panels.Each panel is equipped with single or two hanging rollers.It depends on the horizontal hanging roller to make the partition panel hanging along the track.The vertical contact points of each single panel are connected by concave and convex positions.The seal rubbers are embedded and panel top and bottom parts are equipped with a retractable mechanism.
When closing, the partition can be hidden in a dedicated storage cabinet, which does not affect the overall appearance.

product-EBUNGE-img-4product-EBUNGE-movable partition wall;interior wooden partition wall;folding partition wall-img-4
Packing & Shipping:

Our normal packing for movable partition wall is carton package, MDF batten on four section sides ,foam board on both front face.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-4

Free Sample in 10 Days

Inquiry now and you will have your sample in 10 day if you pay the  express.

3-year Warranty

The acoustic room divider made of 6063-T5 alumina, anti-aging, no fading and abrasion in 10 years.

OEM Service

Your logo can be printed on the packaging carton.

Case show:

product-EBUNGE-img-4

About us:

Guangdong Bunge Building Matarial Industrial Co.,Ltd is professional company in manufacturing movable partitions.It also
artistically designs and carefully does research and development(R&D).The company has adopted the advance partition technology of USA,Germany and Denmark.We have professional staffs with more than 10 years of experience in design,production and installation.
Our product(movable partition)are widely used in the hotel,banquet hall,meeting room,exhibition hall,conference room,International convention center,KTV,upscale restaurants,office building,school,hospital and others.
Nowadays,the modern trend in building needs more flexibility and convenience to use the space of their rooms.Most of the building designers like to prepare open plan space,sound proof effect,and easy to operate.The solution of the designers need is the movable partition.
Bunge movable partition products as follow:
1.Ordinary Series:65MM,85MM;
2.High Sound Proof Series:85MM,100MM;
3.Super High Series:Steel Track System
4.Glass Series:65MM & 85MM Aluminum Frame.

product-Movable partition wall bearing aluminum track partition wall board interior wooden partition-6

Customer photos:

We have clients from all over the world,they are satisfied with our soundproof movable partition walls.
When they came to our factory, they all surprised at our environment and our technology.
There are a big movable wall show room in our factory, with different finish samples. Like glass partition, melamine partition, leather partition, fabric partition etc.

product-movable partition wall;interior wooden partition wall;folding partition wall-EBUNGE-img-6

Favorable rate
100%
Buyer impression
This product has no buyer impression
  • All reviews(0)
  • Praise (0)
  • Average (0)
  • Bad review (0)
Product Message
社媒暂无评论
Chat Online 编辑模式下无法使用
Chat Online inputting...