EBUNGE  > 

AI - Page Sitemap

 > 

movable partition

movable partition

Movable partition

Model
85 mm sound proof movable walls
Brand Name
EBUNGE
Original
Guangzhou, China
Payment Terms
T/T or Western Union also welcomed
Delivery Time
15 - 20 days
Supply Ability
50000 square meters per month
MOQ
No MOQ, small quantity welcomes
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept customized
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Sound proof movable walls
Feature: Sound proof
Finish: Melamine
Application: Banquet room partitions
General use: Commercial furniture
Material: MDF + Aluminum
Sample: Free
Height: 2 - 6 meters
Based board: 9 mm MDF Board
Thickness: 85 mm(3 1/4 Inch)
Function: Divide space
Size: Partition walls customized
Color: Optional
Style: Folding and sliding
Enterprise Strength
  • BUNGE PARTITIONS puts customers first and makes effort to provide quality services based on customer demand.
Application Scope
The folding partition of BUNGE PARTITIONS is applicable to the following areas.BUNGE PARTITIONS provides comprehensive and reasonable solutions based on customer's specific situations and needs.
  • application-EBUNGE-img-1
Company Advantages
1. Our movable partition is rich in modern design and delicate production.
2. The product takes full advantage of the expertise of acoustics. The retractable seal on the top and bottom can effectively interlock together to achieve the desired acoustic seal.
3. The product is not prone to corrosion. It adopts anodized aluminum frames and aluminum trims, which are able to withstand the environmental elements.
4. The product requires a low number of workers to execute production tasks, which will help reduce labor costs and help manufacturers achieve a competitive advantage.
5. People who use this product will find it is not irritating to the skin. Instead, the touch is soft and comfortable.

Aluminium Frame Banquet Sliding Folding Room Partitions Soundproof Movable Walls for Restaurants


Finished Project


Thanks for the trust from the client who comes from India.

This banquet hall operable partition walls project finished and delivered in March,2018.

Totally 4 sets of walls. Height:3.76 meters. 185 square meters. 


Our technician also went to project to supervise the installation. After installing the tracks system well, our technician came back and the client need us to do the pocket door for him.

Finish: Melamine Surface. Color Chart: CS-3061F.

movable partition-1

movable partition-2

movable partition-3

movable partition-4


Sound proof movable walls technical information


Series

BG65

BG85

BG100 

Panel suspension

Top hung only

Top hung only

Top hung only

Panel thickness

65mm

85mm

100mm

Max height

4000mm

6000mm

18000mm

Panel width

500-1200 mm

500-1200 mm

500-1200 mm

Face material

9mm

9mm

12 mm

Pass doors

Single door or Double door

Sound insulation

20-32dB Rw

28-36dB Rw

32-50dB Rw

Finish Material

Plywood, MDF, Laminate, Melamine, Gypsum board, Fabric, Leather, Insulation board, Fireproof board, Wall paper, 

Vinyl, Painting, etc.  (Customized)

movable partition-5


Sound proof movable walls features


1. The sound proof movable wall is a hanging system, which have the ceiling rails, but have no floor reails. So it will not damage the floor or carpet at the project site.

2. All of the sound proof movable walls can be customized, such as the size, the colors and the surfaces.

3. The sound proof movable walls can help you divide a big space into 2 or more smaller rooms. When you do not use them, they can be parked to the parking zone conveniently and quickly.

4. The operation is very easy, 1 person can finish the whole operation.

5. More than 60 kinds of colors to choose.

6. Different surfaces also available. Such as the MDF, Plywood, Melamine, Veneer, Fabric and Leather surface.

7. Single or Double Pass Door also available, which can help you come in and out easily.

movable partition-6


Related products


1.  Movable partition walls, operable walls, movable doors, acoustic room dividers, sound proof partitions.

2. Office furniture: office workstations, office chairs, conference chairs, stackable conference tables.

3. Glass partitions: movable glass partitions or fixed glass partitions for office or conference room also available.

4. Partition walls accessories: partition walls tracks and wheels.

movable partition-7


Sound proof movable walls packaging 


A short time of production-ONLY 5-7 DAYS


Quick and Safe Shipping


Package by Wooden Boxes

movable partition-8


About us

Guangdong Bunge Building Material Industrial Co.,Ltd is a professional company in manufacturing Movable Partition Walls System. We are the real manufacturer, we have our own factory and showroom in Guangzhou, China, which covers an area over 3000 m². And we have around 10 years experience in it. There is a ultra-high system sample in our factory, over 8 meters. Every client who came to our factory was amazing in it. BUNGE Factory is always providing the clients with nice quality and competitive price movable wall system, and we are so strict to inspect the quality before delivering. So far, we have exported to USA, Australia Uganda, Lebanon, Sri-Lanka, Saudi Arabia, Philippines and many other countries. 

As a professional manufacturer, we not only produce, we also design, deliver and have the after-sales service for clients. If the client need installation service, we also can send our technicians to supervise the installation. In addition, we also can supply free design to every client and we will reply in 12 hours if the clients have any questions.

movable partition-9




Company Features
1. BUNGE plays an important role in the layout of the movable partition industry.
2. Our factory sticks to the ISO 9001 international quality management system from the very beginning. Under this system, we set standards for all production stages to help ensure customers get consistent, good quality products.
3. We are committed to social responsibility in the communities we operate, focusing on reducing carbon footprint, providing time and financial support to the communities in which we live and work, and helping customers become more sustainable. The current business goal of our company is to improve the brand influence. By projecting a positive image, being active in the community, and engaging with customers, the company can bolster a company's image and make more people know its brand. Call now!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...