EBUNGE  > 

AI - Page Sitemap

 > 

movable partition

movable partition

Movable partition

Model
BG modular glass office workstations
Brand Name
EBUNGE
Original
Guangzhou,China
Payment Terms
T/T or western union also available
Delivery Time
15-20 days
Supply Ability
50000 sets per month
MOQ
No MOQ,small quantity welcome
Packing Details
Paper carton, outside with wooden box
OEM/ODM
Accept customzied
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Modular glass office workstations
Feature: Modern office workstations
Finish: Melamine
Application: Office, conference room, meeting room
General use: Office furniture
Material: Melamine+metal structure
Function: Office staff work
Size: 1200*600 mm, accept custzomized
Color: Can be customized
Application Scope
movable walls's application range is specifically as follows.BUNGE PARTITIONS insists on providing customers with one-stop and complete solution from the customer's perspective.
  • EBUNGE-High End Modular Glass Office Workstations Cubicles 2-6 Person Seats Partitions
Company Advantages
1. The well-designed movable partition makes it more special than other similar products.
2. movable partition has the merit of foldable partition doors, which is used in style movable partitions .
3. By strict quality assurance, movable partition has received much reputation until now.
4. Guangdong Bunge Building Material Industrial Co.,Ltd provides customers with transparency throughout the entire process.

Modular Glass Office Workstations Cubicles 2-6 Person Seats Partitions

Office Workstations Deatils

 

Material:


Table:25mm MFC (chipboard with melamine surface&PVC edging),scratch resistant.

 

Screen:make use of glass with aluminium frame (aluminium profile itself is 1.2mm-1.5mm).

 

Construction:

 

1>High quality aluminum alloy profile with oxidation treatment on the surface and has great security and durableness.

 

2>Wire pipes could be set in the Left and Right of the washboard,and electric outlet board could be installed on the surface of the washboard in order to meet the wire installation requirement of any working places.


3>Fabric finished partition panel.


4>Fixed three drawer pedestal,lockable.

movable partition-1


Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

movable partition-2

movable partition-3

movable partition-4

movable partition-5

Office Workstations Advantages

1>.Professional manufacturer,prefect workmanship.

 

2>.Enjoy high reputation from old client.

 

3>.The deilvery time is promptly.

 

4>.The mixed order,trial order are accepted.

 

5>.Independent raw material inspecting office to guarantee the quality of the raw material.

 

6>.During the production process,the workers are strictly carry every prodcuing fules.

 

7>.Each office workstations should be tested before delivering out producing workshop.

movable partition-6


Office Workstations Finishing

There are 3 kinds of finishes to choose:

movable partition-7


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

movable partition-8


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

movable partition-9



Company Features
1. As one of largest movable partition manufacturer, Guangdong Bunge Building Material Industrial Co.,Ltd is regarded as the most reliable enterprise.
2. With years of commitment to the concept of quality, we have won a number of loyal customers and established stable cooperations with them. This is the evidence of our strong capability in improving product quality.
3. Our goal is highly motivating and clear, namely, to become a top player in the international markets. We will keep updating the product catalog, enhancing innovation, and offering better customer service. Common development win-win situation is the driving force of our business. We will allow our customers to engage with the business and strengthen interaction with them about the product and services.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...