EBUNGE  > 

AI - Page Sitemap

 > 

modular toughened glass partition wholesale for office

modular toughened glass partition wholesale for office

Modular toughened glass partition wholesale for office

Brand Name
BUNGE
Original
Guangzhou,China
Payment Terms
T/T is most common for us,others are also ok
Delivery Time
8-12days
Supply Ability
500 square meters per month
MOQ
No MOQ
Packing Details
Carton packing and box packing
OEM/ODM
OEM Service
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Fixed glass partition wall
Partition material: Aluminium frame and tempered glass
Application: Conference room,office and etc
General use: Office furniture
Material: 100% Polyester Fiber
Function: Divide space
Size: Panel thickness 83 m
Color: Can be customized
Style: Fix glass partition wall
Company Advantages
1. EBUNGE toughened glass partition is manufactured by adopting RTM-technology which is the preferred technique for manufacturing components that are exposed to heavy structural stresses. It will be safely packaged in a carton box and a wooden box
2. The product has high economic value. It can be turned into higher value goods from mineral materials improvement and manufacturing. It is manufactured according to environmental protection requirements
3. This product is free of harmful substances. During the production stage, the threads used to create the fabric was not treated with any chemical. The product becomes popular for its movability
4. This product has the desired cushioning effect. Adopting high-performance materials, it has the ability to spread the foot load, reducing the impact of foot landing. Multiple accessories of the product can be provided to the customers
5. The product is known for excellent wear and tear resistance. It can stand up heavy daily use yet will not become age after used for a period of time. It can divide a large space into small spaces for effective space utilization

Modern Design Modular Fixed Office Glass Partition Wall


Attention

BUNGE FACTORY OFFER YOU

1: FACTORY DIRECT PRICE.
2: NICE QUALITY.
3: QUICK SHIPPING WITHIN 5 DAYS.
4: SUPPORT CUSTOMER DESIGNS. 
5: NO MOQ, SMALL ORDER WELCOME.
6: MORE THAN 3 YEARS WARRANTY.

modular toughened glass partition wholesale for office-1

Description


The glass partition products can be dismantled , repeated use, the materials of the partition system is a green building materials and environment-friendly materials.


The door, windows, modules entity, the location of the glass partition can be changed to suite your need, you can regroup and then use the materials after disassembly, component damage is not likely to occured 

even after regrouping or disassembly, so the glass partition system can greatly reduce costs for any office relocation.The installation of the glass partition is faster than ordinary wall.


Glass partition can be fire-resistant , compartment system is made by metal structure, glass, color steel plates etc , which also could be fire-resistant. While the compartment system is of steel structure system, the fire-resistance could be or 30 min, 60 min or a longer time.


modular toughened glass partition wholesale for office-2


Technical information

Product Name

Office glass fixed partition

Blind

remote control blind and manual blind are available

Shape

L shape,linear shape,straight shape

Size(mm)

customized 

Color

More than 60 colors available

Glass

Double glass,single glass,frosted glass(10/12mm)

Partition Material

Aluminum frame+ panel/ glass /fabric / steel board

Desktop Seal edge

PVC/ABS

Accessories

Famous brand accessoriess

Products Character

Anti-Water, Anti-Scratch, Anti-Dirty

Packing

Standard export packing

Others

OEM,customized available


modular toughened glass partition wholesale for office-3


Feature


1. Glass partition wall could be turned over 180 degree in order to adjust the line of sight and save energy.


2. The special structure design dose not only help to install easily and efficiently, but conduce to disassemble conveniently and replace the profile (type material), panels, etc.


3. The repeated utilization ratio of aluminum alloy profile could get to 90% above.


4. The partition system adopts high quality rubber seal without any glue. There is no dust and hazardous substance to pollute the environment and clean easily.


5. The partition system could be connected with buffer transition to meet various needs of engineering decoration and office facility.


modular toughened glass partition wholesale for office-4


Our service


1.Profession--We have professional sales staff. Any questions will be replied within 24 hours.


2.Price--Because we are factory,so we can provide nice quality and lower price products.


   Series 63,more than 200 square meters, free sample.


   Series 80,quantity up to 500 square meters, discount 300 USD.


3.Service--Easy and convenient to transport,we promise timely delivery date, and good after-sale service.

  

4.Team--We have our own engineering department, according to your request for your tailor-made for your product.


5.Installing--Our engineer can come to teach installing,and we will also supply installing drawings and video.


modular toughened glass partition wholesale for office-5

FAQ


Q1: Do you provide the design solution and drawings?


Yes, sure. We can design the systems you need to match different wall systems.


Q2: What is the standard size of your windows and doors? 

Our product is CUSTOMER MADE. We always manufacture windows and doors according to buyer's dimensions.


Q3: What is your warranty ? What do we do in case of problems? 


5 years quality warranty is provided,including frame unfading nor peel-off, hardware and accessories working properly under correct operation.In case of our quality problem, we will provide replacement by international courier.


Q4: What kinds of hardware can you supply ? 


Commonly Germany brand,China top brand and Australia brand,and other brands are available.


Q5: What is your MOQ order? 


10 piece is accepted. And the price is relative to the quantity you order.


Q6: What is your payment terms? 


30% - 50% of total amount by T/T as deposit when confirmed the order and balance paid by T/T  before loading container.


Q7: What's the delivery time? 


15 days for the standard color and 35 days for the customized. It depends on the details.



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd has a wide sales network and receives a high reputation for its toughened glass partition .
2. Guangdong Bunge Building Material Industrial Co.,Ltd always introduces technical and professional personnel to increase technical capabilities.
3. We promise a green and sustainable production way. We encourage workers to make full use of resources and reduce wastes with the help of highly efficient production machines.
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...