EBUNGE  > 

AI - Page Sitemap

 > 

modular office workstation supplier for boardroom

modular office workstation supplier for boardroom

Modular office workstation supplier for boardroom

Model
BG office workstations
Brand Name
BUNGE
Year of Establishment
2011
Original
Guangzhou,China
Payment Terms
T/T is common for us. Western union is also ok
Delivery Time
15-30 days based on the different places
Supply Ability
5000 sets
MOQ
No MOQ
Packing Details
Paper cartons, outside with wooden boxes
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:
Product name: Office workstations
Feature: Eco-friendly
Aluminium frame thickness: 3.2CM/4.5CM/2.0CM/1.8CMthickness
Partition material: Aluminum and board
Finish: Melamine,veneer,metal
Application: Conference room,office,meeting room
General use: Office furniture
Material: MDF+Melamine
Function: Office Work,office partitions,office dividers,office standing
Size: Accept customized
Color: Can be customized
Style: Modern
Product Comparison
BUNGE PARTITIONS has the ability to meet different needs. folding partition is available in multiple types and specifications. The quality is reliable and the price is reasonable.BUNGE PARTITIONS's folding partition has the following advantages over other similar products.
  • EBUNGE-office workstation | Office Furniture | EBUNGE
    EBUNGE-office workstation | Office Furniture | EBUNGE-1
Company Advantages
1. The raw ingredients of EBUNGE cubicle furniture are carefully handled. They are stored properly to prevent contamination or alteration and are tested or examined to assure the quality of makeup products.
2. The product is extremely movable. It is composed of multiple individual elements, which flow along with a horizontal guide attached to the ceiling, assembled one after another.
3. The product features high acoustic insulation. It has achieved sound insulation values of up to 57 dB with interlocking corner construction.
4. This product has many advantages, has won a good reputation in the market, and has broad market potential.

Aluminum Partitions Melamine Modern Office Desk Workstations

Office Furniture Deatils


 

1. The aluminium profile itself is 1.2mm-1.5mm, and finished patition thickness is 60mm and 30mm.


2. The modular office workstation is made of panel, aluminum, glass, white board and others.


3. Different layout and dimensions can be made by customer's requests.


4. Colors of the computer workstation partition and tabletop are subject to customer's requirements.


5. Matching prodcucts like movable/fixed pedestal, CPU Trolly, Keyboard Tray are available with us.


6. Different combination materials of the office partitions will be manufactured by your own will.


7. This type is a classical one and we have exported it to many Mid-Eastern countries.


8. Easy to install.


modular office workstation supplier for boardroom-1

Technical Information

Size

 Can be customized

Workstation table top

 25mm thickness melamine board(MFC), PVC edge banding

Melamine color

 White, grey, black, silver, blue, grey, red, green or any wood grain color,accept customized.

Screen/partition material

 Aluminum, glass, panel, or MDF

Size, color, design 

 Can be custom made 

Accessories optional

 CPU holder, keyboard tray, pedestal with or without wheels, side storage

Sample

 Available

Package

 Carton box

OEM

 Welcome

Application Office, home, bank...working area
Feature Modern, easty to install 
Advantages

 1) 100% safe and friendly material.

 2) Various material and color options.

 3) Accept mixed order in a container.

 4) Experienced to provide professional service for customized order, to meet specific need for small or big office furnishing project.

 5) Provide "one-stop" service, to save your time and cost.

modular office workstation supplier for boardroom-2

Office Furniture Advantages

1--Office workstations furniture design,fresh MFC boards are strong and innocuous,safe for long time using; 


2--Firmer frame,enable it can support maximum strength in public;


3--Detachable structure, so more quantity in container is allow,save your shipping cost;


4--Easy for installationin, All accessories and screws will be along with goods;


5--Plastic footpad under frame to keep the ground out of scratching;


6--BUNGE colour options available are Green,Light Gray,or as your request.

modular office workstation supplier for boardroom-3


Office Furniture Finishing

There are 3 kinds of finishes to choose:

modular office workstation supplier for boardroom-4


Packaging & Delivery

Detailed Packing:

 

1. KD packing.

 

2. Shipping marks can be decided by customers.

 

3. Outside: thick carton to reduce extrusion & collision in transit.

 

4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.

 

Shipping Details:

 

1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.

 

2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.

 

3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.

modular office workstation supplier for boardroom-5


Our Service

Our Service

 

1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.

 

2. Reply within 12 hours.

 

3. Prompt delivery.

 

4. First class after-sales service.

 

5. Provide free accessories for customer to reserve before shipment.

 

 

Quality Control:

 

1. Before the mass production, the Pre-Production Sample will be made firstly. Material and color will be checked with the clients.

 

2. The medical mesh office chair with locking casters will be traced from the material purchase.

 

3. Every production procedure, our QC will check the quality carefully and trial assembly.

 

4. The finished medical mesh office chair with locking casters will be checked again and cleaned before packing.

modular office workstation supplier for boardroom-6



Company Features
1. Guangdong Bunge Building Material Industrial Co.,Ltd provides a variety of office workstation options in all price ranges.
2. We have our own designers to develop new office partitions .
3. Guangdong Bunge Building Material Industrial Co.,Ltd is committed to creating excellent company that has provides solutions for pc workstation desk . Inquire online! Guangdong Bunge Building Material Industrial Co.,Ltd has always upheld 'Good Faith as Principle'. Inquire online!
Product Message
Chat Online 编辑模式下无法使用
Chat Online inputting...