Modular office desks,6 person office partitions,4 seat office workstations
This office modular workstation partition is elegant and natural style. With natural wooden and sunshine yellow color can shine office place, make you more comfortable when working. Also match ashtraies on each station for your convinience.
* Material: E1 grade melamine faced chipboard ,Table top 25mm ,2mm pvc edge banding.
* foot stool: painted cone white foot stool with wire groove.
* Screen: 9mm wooden board .
* Price includes three smoke ark on the table, for one single station price.
Model No. | BUNGE Office Workstations |
Material | E1 Level High Density Board/Melamine/Aluminum |
Size | 1500*500*750/seater |
CBM | 0.5 cbm/5 PC |
Net Weight | 75 KG |
QTY/40HQ | 180 pieces |
Steel Thickness | 1.5MM thickness tube |
Color | More than 20 colors can be optional. |
Packing | Standard carton with foam corner |
Advantages | * Thousands of models for choice to meet different client's demands; * Different styles with different price range, can control cost with best way; * Customized service, OEM, ODM available |
Name | Modular office desks,6 person office partitions,4 seat office workstations |
Keywords | Modular office workstations,office partitions,office desks,4 seat workstations |
General Use | Commercial Furniture ; Office Furniture |
Material | E1 MFC(melamine faced chipboard)+High quality Alunimum+Metal |
Color | Many color options, Black, Orange, Beige, Brown, etc. |
Size | Customized size |
Quality Guarantee | >5 Years |
Certificate | ISO9001 and ISO14001 |
MOQ | No MOQ |
Delivery time | Approx. 10 days |
Output | 8000 PCS/Month |
Loading Port | Guangzhou /Shenzhen |
Payment | T/T, L/C |
Packing Detail | I) Office Workstations will be packed KD non-assembled with standard export carton II) Shipping mark TBD III) Anti-Moisture plastic/polyethylene material inside for protection |
1--Office partitions table design,fresh MFC boards are strong and innocuous,safe for long time using;
2--Firmer frame,enable it can support maximum strength in public;
3--Detachable structure, so more quantity in container is allow,save your shipping cost;
4--Easy for installationin, All accessories and screws will be along with goods;
5--Plastic footpad under frame to keep the ground out of scratching;
6--BUNGE colour options available are Green,Light Gray,or as your request.
There are 3 kinds of finishes to choose:
Detailed Packing:
1. KD packing.
2. Shipping marks can be decided by customers.
3. Outside: thick carton to reduce extrusion & collision in transit.
4. Inside: masking tape and bubble bag to protect the chair not to be affected with damp and crash during transit.
Shipping Details:
1. Courier Shipment including DHL, UPS, FEDEX. We will search the most economic and reliable shipping company to transport the goods safely.
2. Airport Shipment. If your order exceeds 100kg, air shipment will be more economical than express.
3. Ocean Shipment. If you order large quantity goods, we can help you to deliver them by sea.
Our Service
1. High-level professional, experienced and skillful technicians to control design and quality of medical mesh office chair with locking casters.
2. Reply within 12 hours.
3. Prompt delivery.
4. First class after-sales service.
5. Provide free accessories for customer to reserve before shipment.
Copyright © 2018 Guangdong Bunge Building Material Industrial Co.,Ltd. | All Rights Reserved
Hello, please leave your name and email here before chat online so that we won't miss your message and contact you smoothly.